BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 17, 2024 at 7:00 PM

Updated November 23, 2024

Site work, paving and outdoor lighting for a mixed-use development in Tucker, Georgia. Completed plans call for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; for paving for a playground / park / athletic field; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

https://roughdraftatlanta.com/2024/11/13/tucker-pickleball-construction-concerns/ Despite assurances that Tucker’s controversial proposed pickleball court construction project is on hold for now, residents voiced their opposition to it at the Nov. 12 city council meeting. During public comment, residents who live near the Tucker Recreation Center cited issues with potential flooding, property values, noise, and dissatisfaction about the lack of public input regarding its construction. __________ Reference Number : 0000362615 The project consists of the redevelopment of an existing sports field into a pickleball complex/ The work to be performed by the General Contractor consists of, but is not limited to grading and erosion control, sports lighting, electrical, water, sewer and underground detention and related storm water improvements, parking lot, sidewalks and driveway renovations, construction of 12 pickleball courts and appurtenances, installation of restroom/pavilion structure, and landscape installation. Project Description: The project consists of the redevelopment of an existing sports field into a pickleball complex at 4898 Lavista Road, Tucker, GA 30084. The work to be performed by the General Contractor consists of, but is not limited to, the following major items: 1. Grading and erosion control 2. Sports lighting, electrical, water, sewer and underground detention and related storm water improvements, 3. Parking lot, sidewalks and driveway renovations, 4. 12 pickleball courts and appurtenances, 5. Restroom/pavilion structure 6. Landscape installation. Question Deadline 09/24/2024 at 1:00 PM ET Questions are submitted online : No . Completion from Notice to Proceed 304 Days (10 months) - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % Bidder Agrees That in Case of Failure on His/her Part to Execute Said Contract and Bond, or Provide Satisfactory Proof of Carriage of the Insurance Required, Within Twenty (20) Calendar Days After the Award Thereof, the Bid Bond or Certified Check Accompanying This Bid and the Money Payable Thereon Shall Be Forfeited to the Owner as Liquidated Damages; Otherwise, the Check or Bond Accompanying This Proposal Shall Be Returned to the Bidder. The City of Tucker reserves the right to reject any and all bids or any part, to waive any formalities to make an award and to re-advertise in the best interest of the City. The City, in its discretion, may award a contract to the most responsible and responsive bidder submitting the proposal which is deemed to be the most advantageous to the city, price and other factors being considered, as described in the selection criteria.

Post-Bid

Playgrounds / Parks / Athletic Fields

$500,000.00

Public - City

Outdoor Lighting, Paving, Site Work

85

9

5

6

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
130
Bidding Soon
2,066
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

Project location map

Multiple Locations, Tucker, GA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.