BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work, paving and new construction of a mixed-use development in Pineville, West Virginia. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; for the construction of a 18,568-square-foot pre-engineered storage facility; pre-engineered storage facility; and water / sewer project.

Barkers Creek Industrial Park Shell Buildings Thrasher Project The Barkers Creek Industrial Park Shell Buildings Project #01-79-15278 will be partially funded with federal funds from the United States Department of Commerce, Economic Development Administration and therefore is subject to the Federal Laws and regulations associated with that program. The Project includes the following Work: The project will involve the construction of two separate shell building spaces. The first building will be 10,560 square feet and 30'6" tall. Approximately half of this square footage will be open air on the side of the building with three walls and a roof to receive material deliveries. The second building will be 8,008 square feet and 55' tall. The buildings will be engineered metal buildings and include ventilation, a bridge crane, utility connections, and associated site work. The project will also include the reinforcement of an existing bridge structure to be used for construction purposes. The Work will be substantially completed within 330 calendar days after the date when the Contract Times commence to run and completed and ready for final payment within 330 days after the date when the Contract Times commence to run. Liquidated damages shall be $1,000 per day. A bidder may not withdraw his bid for a period of ninety (90) days after the date set for the opening of bids. Bids shall be accompanied by a certified check or bid bond payable to Wyoming County Economic Development Authority in an amount equal to five percent (5%) of the base bid. A one hundred percent (100%) Performance Bond and a one hundred percent (100%) Payment Bond are required for the successful bidder as part of the conditions of the work. Contractor is required to provide the Drug Free Workplace Certification in accordance with WV Code 21-1D-5. Contractors are required to comply with all laws pertaining to prevailing wage rates for the federal wage rates issued in accordance with the Davis Bacon Act. All Bidders are required to have a West Virginia Contractor's License per Section 30-42-12 of the West Virginia Code. The Wyoming County Economic Development Authority reserves the right to reject any and all bids. Q&A 08/22/2025 as per ADDA 1.

Bid Results

Playgrounds / Parks / Athletic Fields

$6,490,000.00

Public - County

New Construction, Paving, Site Work

86

25

20

10

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
46
Bidding Soon
782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 11, 2025

November 4, 2025

Project location map

Multiple Locations, Pineville, WV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.