Published November 7, 2024 at 7:00 PM

Updated November 8, 2024

Site work and paving for a mixed-use development in Fremont, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of November 6,2024, project was awarded to Redgwick Construction Co., awarded amount is $9,448,042.80.** Location and Description. The Project is located on Thornton Avenue between San Pedro Drive/Dondero Way and Fremont Boulevard; on Fremont Boulevard between Alder Avenue and Mattos Road; and Peralta Boulevard between Fremont Boulevard and Sequoia Road, and is described as follows: Project will implement complete streets upgrades and will also complete state of good repair improvements consisting of base repairs, curb and gutter replacement, sidewalk replacement, and AC overlay. The project is more specifically defined in the Contract Documents, but generally includes the following items of work: Furnish and maintain traffic control throughout the period of construction; maintain pedestrian barricades and detour pedestrian traffic around the work area; demolish and dispose of or recycle existing improvements including asphalt pavement, curb, gutter, sidewalk, curb access ramp, medians and traffic islands; construct protected intersection improvements, install new storm drain facilities, modify existing traffic signals to City standard equipment along with bicycle detection, pedestrian countdown heads, accessible push buttons and signal interconnection, install new signal at Thornton Avenue and Oak Street near Thornton Junior High School, remove right turn slip lanes, upgrade existing curb access ramp, install raised cycle track on Fremont Boulevard between Thornton Avenue and Peralta Boulevard, place hot mix asphalt concrete pavement, slurry seal pavement, install striping and pavement markings to narrow traveled lanes, install buffered bike lanes, install crosswalks and stripe green skip-striping through conflict zones. There may be other items of work not mentioned above that are shown on the plans and required by the State Standard Specifications and/or the Special Provisions. Questions, requests for information, and requests for clarification regarding the Project, the bid procedures, or any of the Contract Documents must be submitted to City in writing, addressed to the Project Manager for the Project, as follows: Jeanne Suyeishi, Principle Civil Engineer 39550 Liberty Street, Fremont, CA 94538 jsuyeishi@fremont.gov Jason Liu, Associate Civil Engineer 39550 Liberty Street, Fremont,CA 94538 xliu@fremont.gov Question Deadline 09/24/2024 at 2:00 PM PT

Award

Roads / Highways

$9,448,043.00

Public - City

Paving, Site Work

108

13

6

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
516
Active Projects
186
Bidding Soon
3,429
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 8, 2024

December 2, 2024

Project location map

Multiple Locations, Fremont, CA

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed