BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 6, 2024 at 7:00 PM

Updated December 10, 2024

Site work for a playground / park / athletic field in Kansas City, Missouri. Completed plans call for site work for a playground / park / athletic field.

https://www.bizjournals.com/kansascity/news/2024/12/05/drake-development-pennington-plaza-merriam.html We’re going to submit (an RFP) on the tennis courts down on the Plaza. I look at projects like that as something that will be more our speed, something with a lot of density in an urban environment. Projects like Merriam Grand Station, I see us doing something like that, something which is just really centrally located — can we assemble 10 acres (and) can we make it amazing with restaurants just like that? I see us doing something like that all over the Midwest in key markets. [Note: This interview was completed before the city closed its request for proposals for the Plaza Tennis Center on Nov. 18. A full proposal by Drake was not public as of publication, but Pennington said the developer’s plans would involve a “true, fully integrated mixed-use project.” It would involve moving the existing tennis courts off site and contesting the Plaza area’s 45-foot height standard for the site, he said.] ----------------------- The City of Kansas City, Missouri ("the City") is soliciting proposals for the development of City-owned parcels currently utilized for the Plaza Tennis Courts in the Country Club Plaza District in Kansas City, Missouri, approximately located at 4747 Mill Creek Parkway and 4700 Brookside Blvd (the "Site"). The City would consider either the sale or lease of the Site and is willing to discuss creative financing models including those that provide stable revenue to the Parks and Recreation Department. Any development of this Site requires replacement of The Plaza Tennis Courts complex to another desirable location within the City before development of the Site commences Questions Due Date: Sep 27th 2024, 3:00 PM CDT

Post-Bid

Playgrounds / Parks / Athletic Fields

$40,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
102
Bidding Soon
1,184
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 12, 2024

December 12, 2024

Project location map

4747 Mill Creek Pkwy, Kansas City, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.