BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 10, 2024 at 8:00 PM

Updated October 11, 2024

Site work and paving for a sidewalk / parking lot in Palo Alto, California. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

A. The work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. B. The work shall be complete, and all work, materials, and services not expressly shown or called for in the Contract which may be necessary for the complete and proper construction of the Work in good faith shall be performed, furnished and installed by the Contractor, at no increase in cost to the City. The Contractor shall also be responsible for construction coordination with other construction activities within the City. Thisincludes coordinating work and phasing with the City related to the removal, relocation, and installation of City Utilities, to include but is not limited to, fire hydrants and electrical switches and transformers. Engineers estimate is $3,342,289.80 Pedestrian and bicycle safety improvements to a portion of Churchill Avenue from El Camino Real to West of Alma Street and improvements at the intersection of Churchill Avenue and El Camino Real. Question Deadline 09/17/2024 at 1:00 PM PT Such request shall be submitted electronically via the City's electronic procurement system's Q&A function.

Award

Sidewalks / Parking Lot

$2,488,857.00

Public - City

Paving, Site Work

29

18

7

3

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
348
Active Projects
180
Bidding Soon
2,738
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

June 2, 2025

Project location map

El Camino Real & Churchill Ave, Palo Alto, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.