BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition and site work for an educational facility in Hillsboro, Texas. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

IFB Hydro-Demolition Demonstration - To be performed at various locations along IH-35 in the greater Waco Area - Price(s) bid must be include any costs necessary to complete this task, including but not limited to: Labor, Machinery, Fuel, Hardware, Supplies. Hydro Demolition only: Quoted price should be based on a 10-hour daily rate to showcase the hydro demolition process to determine speed, long term value and logistics of the process based on blasting several 7-inch-deep areas to be determined by agency. Agency will: 1. Provide access to work area for all equipment and all personnel to include adequate protective shoring around each foundation listed for hydro-demo. 2. Provide layouts of area to Hydro-demo to inspect depths of demo area. 3. Provide accessible clean water to contractor's pumps at an average rate of 60 GPM to allow continuous operation and also as hydrant 4. Supply, install and maintain shielding as required on work site to protect surroundings if required. 5. Agency or Sponsor will provide appropriate personnel, from additional contractors, to successfully conduct demonstration. 6. Provide haul off and removal of all concrete debris other than that in vac truck. Contractor will: 1. Handle bonding and fees IF applicable. Agency will notify vendor if required. 2. Perform Hydro Demolition demonstrations at locations designated by agency. 3. Furnish Vac Truck for suction and discard of small debris and liquid. 4. Provide additional services as may be agreed upon by agency and contractor. Hydro Demo Clean Up: 1. Contractor is responsible for clean-up - Pricing for cleanup should be based on Hydro Demo debris via vac truck and crew. Debris to be dumped hourly within the TXDOT provided pit area. Water treatment not included. Pit area will not be maintained by contractor. Hydro Demo Mobilization/Demobilization: 1. Quote price per round trip mobilization to listed project sites, based on an anticipated one-time round trip of mobilizations per day. Contractor will make every effort to limit the removal demonstration to the desired depth. Contractor will not be liable for unintended removal due to unsound concrete encountered or any damage to beams, girders or pans, due to unintended removal of concrete during the demolition process (blow through). Exclusions: Layout of any sawing, trench covers, access, permits, water control, dust control, barricading, traffic control, escorting, breaking and/or removal, protection of any properties, damage to any unmarked utilities, final cleanup of work area and concrete pour back.

Sub-Bidding

Educational

$300,000.00

Public - State/Provincial

Demolition, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
173
Bidding Soon
4,192
All Active Projects
1,669
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 21, 2024

October 22, 2024

img_map_placeholder

I-35, Hillsboro, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.