BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 26, 2025 at 8:00 PM

Updated March 27, 2025

Site work for a civil project in Sammamish, Washington. Design plans call for site work for a water / sewer project.

As of March 26, 2025, this project is in the design phase. Construction will begin in 2026. Sammamish Plateau Water (aka Sammamish Plateau Water and Sewer District or District) is seeking proposals from consultants to provide design services for the construction of a ground level 8MG water storage tank, and associated 3,000-gpm booster station, to provide additional storage to meet the peak summer demand. The proposals shall be limited to twelve 8-1/2 x 11 pages, including cover letter but excluding resumes. The consultant will prepare complete Project plans, specifications, and contract documents (using the District's standard contract documents) needed for the design and construction of: o A new 8MG water storage facility with a diameter of 140-ft and an overflow height of 70-ft. o A 3,000-gpm booster station located either at the tank site or on the west end of the property. o Transmission mains with a minimum pipe diameter of 16-inches to connect the tank and booster station to the distribution system within 228th Avenue SE. o Electrical and communication lines for operation of the installed facilities. o Access road(s) as required for the proposed facilities. The design will address: o 30%, 60%, 90% Permit and 100% designs o Engineering Estimate to be provided at the 30% and 90% designs o Wetland study including a survey and analysis of the wetlands and wetland buffers. The work will address any local, state and federal permits or approvals, in addition to preparing all materials for approval from those agencies. o Permitting with the City of Sammamish o Clearing of the existing site. o Storm water treatment and detention. o Landscaping design including a tree survey, as required for permitting and visual screening of the new facilities. o Sound impacts from both construction and ongoing operations, specifically from operation of the booster station. o Review and design of site security measures and access for operation and maintenance. o Visual impacts of the project to the neighboring properties including shadows. The consultant will also review the impacts to the District, its property, and the Project site by the construction of a public road connecting 231st Avenue NE to 231st Avenue SE. Begin design March, 2025 For information or questions about the project, contact the Project Manager. Project Manager: James E. Konigsfeld, P.E., Principal Engineer Sammamish Plateau Water and Sewer District Jim.konigsfeld@spwater.org. The method of Contractor Selection has not been Determined at this time. Anticipated Award Date: January 27, 2025

Design

Water / Sewer

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
111
Bidding Soon
1,807
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.