BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 2, 2024 at 7:00 PM

Updated December 3, 2024

Renovation of a water / sewer project in Milford, New Hampshire. Completed plans call for the renovation of a water / sewer project.

Buildings/Public, Electrical Equipment & Supplies, Instrumentation, Construction, Demolition/Building Removal/Hauling/Salvage, Retaining Walls, Concrete/Formed/Flatwork/Foundation, Electrical Installation/Construction, Control Panels Replacement/Repair/New Installation, Pavement Resurface and Rehabilitation, Excavation, Electrical, Paving (Asphalt or Concrete), Plumbing, Drainage, Heating, Ventilation, Air Conditioning (HVAC), Removal and Replacement of pipe, Conduit/Electrical/Telemetry, Pumps or Pump stations, Mechanical Systems, Sewer and Water Construction, Masonry Construction & Restoration, Sitework/Excavating and Grading, Water and Wastewater Facilities, Roofing, Painting, Concrete Repair. Base Bid items include a new tertiary treatment building complete with process equipment; flood protection modifications to the existing UV Building; construction of new sludge storage tanks with electrical room and odor control room; yard piping, site electrical and utilities; flood protection and other improvements to the main pump station, , aeration tanks and blowers; and site restoration. Bid alternate items include rehabilitation of primary clarifiers, construction of a new dewatering building shell; and additional secondary process improvements. All technical questions regarding this project should be directed by email to Joseph Ducharme at jducharme@hoyletanner.com. Completion time for the project will be calculated as calender days from the date specified in the "Notice to Proceed" as follows: 730 Calender days for Base Bid substantial completion, or 850 calendar days for Base Bid plus Bid Alt 1,2 and 3 60 additional calendar days for final completion Liquidated damages will be in the amount of $1,500, for each calendar day of delay from the date established for substantial completion, and $1,500 for each calendar day of delay from the date established for final completion. 1. Each General Bid shall be accompanied by a Bid Security in the amount of 5% of the Total Bid Price. 2. The successful Bidder must furnish 100% Performance and Payment Bonds and will be required to execute the Contract Agreement within 10 days following notification of the acceptance of their Bid. Question Deadline 10/16/2024 at 5:00 PM ET

Award

Water / Sewer

$15,171,690.00

Public - City

Renovation

211

26

17

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
566
Active Projects
286
Bidding Soon
4,152
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 25, 2024

December 17, 2024

Project location map

564 Nashua St, Milford, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.