BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Demolition, site work, renovation and addition to a fire / police facility in Forney, Texas. Working plans call for the addition of a fire / police facility; for the demolition of a fire / police facility; for the renovation of a fire / police facility; and for site work for a fire / police facility.

As of November 19, 2024, “The owner has selected a Construction Manager. Proposals for FORNEY FIRE STATION #2 RENOVATIONS Estimate: 5,900,000.00 Scope of Work: Existing Fire Station #2, in service since 2016, is to have renovations and additions to include, but limited to, the following: Addition of new apparatus bay with mezzanine above to accommodate storage and training area. Reconfiguration of existing apparatus bay to allow addition of new overhead door resulting in additional drive through bay for apparatus. Addition of Training/Hose Tower. Additional Public and Fire Fighter parking. Relocation of equipment, extractor, SCBA, and tool room to better utilize space and enhance environmental safety. New Exercise Room and relocation of existing sauna. Relocation of Decontamination area and reconfigure Bunker Gear storage. Renovation of outdoor patio area providing cover and new privacy fence. Interior renovations will include additional bunk rooms, Captain's quarters, new restrooms, Kitchen renovation, paint, and flooring. Please note this will be a phased project under one mobilization of the General Contractor. All work will need to be closely scheduled and coordinated with the Forney Fire Department to avoid any service disruptions to the community. The deadline to ask questions is 9/24/2024 12:00 PM CST Bidders are required to provide all materials, equipment, and labor required for the construction of the project along with a Payment, Performance, and a 2-year Maintenance Bond in the amount of the Contract. The effective date of the maintenance period will commence upon the date of project acceptance by the City of Forney. The successful Bidder will be required to furnish not only a performance bond in the amount of the Contract but also a payment bond for the protection of all claimants supplying labor and materials.

Pre-Construction/Negotiated

Fire / Police

$5,900,000.00

Public - City

Addition, Demolition, Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

14

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
157
Active Projects
72
Bidding Soon
3,610
All Active Projects
1,428
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.