BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Middletown, New York. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000362414 The Work consists of the following: Replacing existing storm drainage structures and piping Installation of new curb and drainage connections from 507 to 549 East Main Street Concrete curb ramp upgrades to meet ADA requirements Full replacement of existing traffic signal equipment, including installation of a 360-degree video detection camera and configuration of new signal controller with provided timings at 3 intersections: Signal # 417 - CR 67 (East Main Street) and CR 92 (Dunning Road) Signal # 419 - CR 67 (East Main Street) and CR 108 (Schutt Road Extension) Signal # 420 - CR 108 (Schutt Road Extension) and Trust Way Installation of a 360-degree video detection camera, replacement of the traffic signal controller, and configuration with provided timings at 8 intersections: Signal # 404 - CR 67 (East Main Street) & Midway Road Signal #406 - CR 96 (Carpenter Avenue) & Wisener Avenue Signal #414 - CR 67 (East Main Street) & Garnet Hospital Signal # 415 - CR 67 (East Main Street) & CR 50 (Golf Links Road) Signal # 416 - CR 67 (East Main Street) & Quick Chek (Med Parc Road) Signal # 418 - CR 67 (East Main Street) & CR 96 (Carpenter Avenue) Signal # 421 - CR 92 (Dunning Road) & Gibbs Court Signal # 422 - CR 92 (Dunning Road) & CR 108 (Schutt Road Extension) & Wallkill Winning Way Milling and paving of approximately 8,600 LF (1.6 miles) of CR 67 (East Main Street) from the Town of Wallkill/City of Middletown line (just west of Anthony Street) to just east of the intersection with CR 50 (Golf Links Road) Additional milling and paving at the CR 67 intersections with CR 96 (Carpenter Avenue), CR 92 (Dunning Road), and CR 50 (Golf Links Road). Installation of epoxy pavement markings (stop bars, double yellow centerline, white fog lines, turning lane lines, lane symbols and letters, crosswalks, etc.) Question Acceptance Deadline 10/09/2024 05:00 PM EDT Questions are submitted online Awarded Contractors shall be required to provide Performance and Payment Bonds, each equal to 100% of the Contract amount and insurance coverages as specified in the Contract Documents, with the County, and Engineer named as additional insureds, and prior to Final Payment, a one (1) year Maintenance Bond against any defects in workmanship or materials in an amount equal to 10% of the Contract Price at Substantial Completion.

GC Bidding

Roads / Highways

$200,000.00

Public - County

Paving, Site Work

49

8

3

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
703
Active Projects
404
Bidding Soon
5,730
All Active Projects
2,329
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 24, 2024

March 17, 2025

img_map_placeholder

Multiple Locations, Middletown, NY

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.