Published November 27, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a municipal facility in Miami, Oklahoma. Completed plans call for the renovation of a 2,806-square-foot, one-story above grade municipal facility.

Summary Project Description: Three separate buildings to be remodeled simultaneously. Building 27 currently has minimal interior wood framing scheduled for demolition. Portions of the back exterior wall are scheduled for removal and replacement with new exterior windows, exterior door assembly, brick, and structure. In addition, a storm shelter will be built in place, designed with 8" CMU fully grouted walls and concrete cap. The remaining areas will be constructed of metal framed wall assemblies, acoustic ceiling tiles for scheduled offices, and a conference room at the far west end. Building 29 is to have selective demolition work, including the existing single- occupancy toilet, to meet current ADA codes and reconfiguration of the back half of the building. Building 29 is scheduled to be the new Tribal Council Chambers. No work will be performed on the second floor or the existing multi-occupancy restrooms. Building 32 will have a storm shelter, constructed similarly to that in Building 27, and will be divided into two groups of offices, both of which will share a break room and conference room. TO: POTENTIAL BIDDERS Construction firms are invited to submit an offer under seal to the Owner for the renovation and construction of the facilities located at: 27 S Main St 29 S Main St 32 A St SE Miami, OK 74354 The Notice to Procced is anticipated to be issued 30 days after bidding. Construciton is anticipated to take 240 Calendar Days. ARPA FUNDING ACKNOWLEDGEMENT: This project is being supported, in whole or in part, by Federal Award Number SLFRP2485, awarded to the Shawnee Tribe by the U.S. Department of the Treasury. Their use does not grant a license for any other purpose. BID DOCUMENT REQUESTS & INQUIRIES: Bid Document requests and other inquiries shall be in writing and directed to either: Michal N. Biery, AIA, NCARB mbiery@bodwegroup.com or Adrianna McCarty, NCIDQ amccarty@bodwegroup.com Offers shall be submitted using the Bid Form provided in the Bid Documents. Bidders will be required to provide Bid Security in the form of a Bid Bond equal to at least five percent (5%) of the Bid Amount. Bidders should refer to other bidding requirements described in Document 002113 - Instructions to Bidders and Document 003100 - Available Project Information. All offers must be submitted under a condition of irrevocability for 30 days after submission. The Owner reserves the right to accept or reject any or all offers.

Award

Municipal

$2,000,000.00

Public - Federal

Renovation

64

22

26

3

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Work Restrictions, Access to Site, Use of Site, Quality Requirements, References, Definitions, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing, Precast Concrete, Precast Structural Concrete
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Hollow Metal Doors and Frames, Wood Doors, Flush Wood Doors, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Finishes, Common Work Results for Finishes, Plaster and Gypsum Board, Gypsum Board Assemblies, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Quarry Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Tile Carpeting, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Safety Specialties, Fire Protection Specialties, Fire Extinguisher Cabinets, Exterior Specialties, Protective Covers
Division 12 - Furnishings

Division 12 - Furnishings

Window Treatments, Casework, Countertops, Furnishings and Accessories, Rugs and Mats, Runners, Furniture
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Plumbing Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Fill, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
79
Active Projects
54
Bidding Soon
776
All Active Projects
369
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

December 2, 2024

img_map_placeholder

Multiple Locations, Miami, OK


Cut Costs, Not Corners.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Renovation & Build-out of Downtown Office Spaces

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.