BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving, outdoor lighting and new construction of a mixed-use development in Coleman, Florida. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; and for outdoor lighting for a playground / park / athletic field.

All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by Kimley-Horn. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Renovation and expansion of park facilities at three existing City parks, namely Dunklin Riser, JL Rowe Park, and Shady Brook Park. Dunklin Riser, 3631 Oak Street, Coleman, FL 33521. DESCRIPTION OF WORK: All work for the Project shall be constructed in accordance with the Drawings and Specifications prepared by Kimley-Horn. Bids shall be submitted for furnishing, delivering, and installing all materials, equipment, and services, including labor for the Work, which generally involves the following activities: Renovation and expansion of park facilities at three existing City parks, namely Dunklin Riser, JL Rowe Park, and Shady Brook Park. Dunklin Riser, 3631 Oak Street, Coleman, FL 33521. Proposed improvements will consist of the removal and replacement of existing playground equipment, new site furnishings, a new basketball court, tennis court improvements, existing picnic pavilion improvements, and associated sitework and paving. JL Rowe Park, 1627 Central Avenue, Coleman, FL 33521. Proposed improvements will consist of the removal and replacement of existing playground equipment, new site furnishings, a new basketball court, tennis court improvements, a new pre-fabricated restroom, a new garden, and associated sitework and paving. Shady Brook Park, 1015 N Hwy 301, Sumterville, FL 33585. Proposed park improvements will consist of the removal and replacement of existing playground equipment, new site furnishings, a new pre-fabricated restroom and associated sitework and paving. CONTRACT TIME: Construction time to achieve Substantial Completion is 210 consecutive calendar days from the date of the Notice to Proceed, with an additional 30 consecutive calendar days to achieve Final Completion. Total construction duration is 240 consecutive calendar days. PERFORMANCE AND PAYMENT BOND: The Owner will require that the Contractor furnish a Performance and Payment Bond in an amount equal to 100% of the Contract Price. All Payment and Performance Bonds shall be secured from or countersigned by an agency or surety company recognized in good standing and authorized to do business in the State of Florida. The City of Coleman is an Equal Opportunity Employer and welcomes bids from MBE/WBE and Section 3 Contractors. Questions are due December 10, 2024 at 5 pm.

Post-Bid

Playgrounds / Parks / Athletic Fields

$300,000.00

Public - City

New Construction, Outdoor Lighting, Paving, Site Work

47

9

14

2

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
67
Bidding Soon
1,207
All Active Projects
441
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

January 16, 2025

img_map_placeholder

Multiple Locations, Coleman, FL

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.