BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Vanceboro, North Carolina. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work consists of reconstructing each shoulder (including median shoulders as applicable) in accordance with Standard Drawing No. 560.01 and 560.02 of the Roadway Standard Drawings except that the rate of slope and width will be as shown on typical section, or to the existing shoulder point, whichever is nearer, aslong asthe desired typical is achieved, and when completed, seeding and mulching. This work shall be performed immediately after the resurfacing operations are complete as directed by the Engineer. This project will require the removal of excess material from the existing pavement by mechanical means prior to paving routes. Excess material generated by clipping excessive shoulder material from the existing pavement will be required to be removed by the Contractor. The Contractor should take care in removing excessive material from the existing pavement to minimize the amount of disturbance to adjacent established vegetation. There will be no direct payment for the removal of any excess material generated from the existing pavement as this work shall be considered incidental to the asphalt pavement line items that correspond with that map. Question Deadline 10/02/2024 Questions should be emailed 7 calendar days prior to the bid opening to Mary Moore, PE at MVMOORE@NCDOT.GOV. Contract Number: DB00588 WBS Number: 2025CPT.02.16.20251 Route: Us 17 Business County: Craven Description: Milling, Resurfacing, and Shoulder Reconstruction of Various Secondary Routes in Craven County The North Carolina Department of Transportation is requesting bids for the above referenced project. The contractor must furnish all labor, materials, equipment, and any other items necessary for the completion of this contract. The availability date for this project is March 15, 2025. The completion date is December 15, 2026. NCDOT - Milling, Resurfacing, and Shoulder Reconstruction of Various Secondary Routes

Award

Roads / Highways

$1,366,461.00

Public - State/Provincial

Paving, Site Work

12

6

7

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
22
Bidding Soon
381
All Active Projects
147
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

March 15, 2025

img_map_placeholder

US-17 BUS, Vanceboro, NC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.