BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 31, 2024 at 8:00 PM

Updated November 1, 2024

Demolition and site work for a playground / park / athletic field in Pittsfield, Massachusetts. Completed plans call for site work for a playground / park / athletic field; and for the demolition of a playground / park / athletic field.

Project Demolition of Clapp Park Warming House Contractor Qualification Required for DCAMM contracts over $150,000, Highway Division contracts over $50,000. Furnish all labor, materials, equipment and incidentals required to complete Demolition of Bathroom Building, Clapp Park, 245 West Housatonic Street, Pittsfield, Massachusetts 01201 as called out in the Contract Documents, plans, and specifications, as prepared by Barry Architects, Inc. dated August 9, 2024. All work is to be done under one contract coordinated by the General contractor acting as the contractor including but not limited to the following: Abatement of hazardous materials as indicated on the contract documents Demolition of the building Removal of foundation and valve box Capping all abandoned site utilities Grading and seeding of areas affected by demolition procedures Protection of site and members of the public. All other items as indicated on the drawings and specified herein.

Award

Playgrounds / Parks / Athletic Fields

$29,285.00

Public - City

Demolition, Site Work

3

11

4

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
399
Active Projects
158
Bidding Soon
2,798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

October 28, 2024

Project location map

245 W Housatonic St, Pittsfield, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.