BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Chicago, Illinois. Completed plans call for the renovation of a educational facility.

SCOPE Remove existing controls and piping and set aside for reinstallation post jacket replacement. Demo the existing jacket and insulation. Insulate Boiler with 2 thick insulation according to CPS Specifications. Replace jacketing with .032 Stucco Embossed Aluminum. Jacketing to be secured in place with stainless steel banding on 2' centers. *Only Prequalified* Various Trades Questions Due Date: Sep 11th 2024, 2:00 PM CDT Provide Labor and Materials: To Replace the Jacket on Boiler 1. SCOPE: Remove existing controls and piping and set aside for reinstallation post jacket replacement. Demo the existing jacket and insulation. Insulate Boiler with 2" thick insulation according to CPS Specifications. Replace jacketing with .032" Stucco Embossed Aluminum. Jacketing to be secured in place with stainless steel banding on 2' centers. New jacketing to be tucked into the existing jacketing and secured. Reinstall piping and controls and test for proper operation. Contractor to secure necessary permits. Contractor to field verify dimensions and specifics of all projects listed above before placing bid. Not responsible for contractor errors as a result of non-field verification. Materials and installation must comply with CPS Standards and Specifications Secure job site overnight if work is not completed in one day. If building or CPS properties are damaged during construction, contractor to replace and/or repair as necessary. Provide necessary labor and materials to fix/correct issues preventing any or all of the projects to be marked as completed. All work shall be coordinated with the Board authorized representatives to complete in an agreed upon time frame. Contractor is to remove and dispose of materials torn out and any construction debris. All trash must be removed off-site by contractor. Clean the surrounding area and make sure all is swept of debris. Question Deadline 10/01/2024 All questions/requests must be received two (2) business days prior to bid due date Schedule insulation application after pressure testing systems and after installation and testing of heat tracing, if required for the Project. Insulation application may begin on segments that have satisfactory test results. Complete installation and concealment of plastic materials as rapidly as possible in each area of construction

Bid Results

Educational

$55,775.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
194
Active Projects
131
Bidding Soon
1,923
All Active Projects
840
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

November 4, 2024

img_map_placeholder

3436 W Wilson Ave, Chicago, IL

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.