Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 3, 2024 at 7:00 PM

Updated December 13, 2024

Renovation of a mixed-use development in Pontiac, Illinois. Completed plans call for the renovation of a detention facility.

As of November 12, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The prime contractor shall provide all labor, materials, and equipment to complete the installation of backflow assemblies throughout the Pontiac Correctional Center. The base bid also calls for the installation of water flow meters, flow meter readout/transceiver units, several insertion valves to facilitate the outdoor installation of backflow assemblies, a water softening system, two variable flow booster pumps, and a reverse osmosis system. Alternate P-1 calls for the installation of communication wiring, controllers, water meter software, and DDC panels to facilitate the transmission of meter outputs to a data acquisition and processing system located in the engineering office through the DOC's new fiber-optic network. Workmanship shall be complete in every aspect, tested, and satisfactory to the Using Agency, CDB, the A/E, and in accordance with State and Federal laws governing this installation Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check The Contractor shall furnish a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, in accordance with the Public Construction Bond Act (30 ILCS 550). Each bond shall be in the full amount of the contract on forms provided by CDB and executed by a surety acceptable to CDB Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 20% MBE, 5% WBE and 2% PBE/VBE.

Award

Water / Sewer

$1,300,000.00

Public - State/Provincial

Renovation

36

20

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
420
Active Projects
167
Bidding Soon
2,763
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 14, 2024

Project location map

700 W Lincoln St, Pontiac, IL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed