BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Pontiac, Illinois. Completed plans call for the renovation of a detention facility.

As of November 12, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The prime contractor shall provide all labor, materials, and equipment to complete the installation of backflow assemblies throughout the Pontiac Correctional Center. The base bid also calls for the installation of water flow meters, flow meter readout/transceiver units, several insertion valves to facilitate the outdoor installation of backflow assemblies, a water softening system, two variable flow booster pumps, and a reverse osmosis system. Alternate P-1 calls for the installation of communication wiring, controllers, water meter software, and DDC panels to facilitate the transmission of meter outputs to a data acquisition and processing system located in the engineering office through the DOC's new fiber-optic network. Workmanship shall be complete in every aspect, tested, and satisfactory to the Using Agency, CDB, the A/E, and in accordance with State and Federal laws governing this installation Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check The Contractor shall furnish a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, in accordance with the Public Construction Bond Act (30 ILCS 550). Each bond shall be in the full amount of the contract on forms provided by CDB and executed by a surety acceptable to CDB Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 20% MBE, 5% WBE and 2% PBE/VBE.

Bid Results

Water / Sewer

$1,300,000.00

Public - State/Provincial

Renovation

36

20

2

5

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
70
Bidding Soon
1,299
All Active Projects
577
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

December 14, 2024

img_map_placeholder

700 W Lincoln St, Pontiac, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.