Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published December 3, 2024 at 7:00 PM
Updated December 13, 2024
Renovation of a mixed-use development in Pontiac, Illinois. Completed plans call for the renovation of a detention facility.
As of November 12, 2024, this project has not yet been awarded. A timeline for award has not yet been established. The prime contractor shall provide all labor, materials, and equipment to complete the installation of backflow assemblies throughout the Pontiac Correctional Center. The base bid also calls for the installation of water flow meters, flow meter readout/transceiver units, several insertion valves to facilitate the outdoor installation of backflow assemblies, a water softening system, two variable flow booster pumps, and a reverse osmosis system. Alternate P-1 calls for the installation of communication wiring, controllers, water meter software, and DDC panels to facilitate the transmission of meter outputs to a data acquisition and processing system located in the engineering office through the DOC's new fiber-optic network. Workmanship shall be complete in every aspect, tested, and satisfactory to the Using Agency, CDB, the A/E, and in accordance with State and Federal laws governing this installation Bid security must be submitted with each bid equal to 10% of the base bid and must be in the form of a CDB bid bond, certified check The Contractor shall furnish a performance bond and a labor and material payment bond covering the faithful performance of the contract and the payment of all obligations arising thereunder, in accordance with the Public Construction Bond Act (30 ILCS 550). Each bond shall be in the full amount of the contract on forms provided by CDB and executed by a surety acceptable to CDB Minority, Women, Persons with Disabilities, and Veteran Business Subcontractor/Supplier Participation is Applicable. The participation goal percentages on the amount of the contract awarded by CDB for this project are: 20% MBE, 5% WBE and 2% PBE/VBE.
Award
Water / Sewer
$1,300,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2024
December 14, 2024
700 W Lincoln St, Pontiac, IL
Related To This Project
Pontiac, IL
Bid Date: Oct 03 2024
Pontiac, IL
Bid Date: Oct 21 2024
Pontiac, IL
Bid Date: Dec 04 2024
Pontiac, IL
--
Pontiac, IL
Bid Date: Apr 25 2025
Pontiac, IL
Bid Date: Apr 25 2025
Pontiac, IL
Bid Date: Jan 17 2025
Pontiac, IL
Bid Date: Sep 20 2024
Pontiac, IL
Bid Date: Jul 08 2024
Pontiac, IL
Bid Date: Jun 27 2024
Pontiac, IL
Bid Date: Jun 24 2024
Pontiac, IL
Bid Date: Jun 24 2024
Pontiac, IL
Bid Date: May 30 2024
Pontiac, IL
Bid Date: May 30 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
