BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 6, 2025 at 8:00 PM

Updated August 7, 2025

Site work and new construction of an educational facility in Stillwater, Oklahoma. Conceptual plans call for the construction of a 220,000-square-foot educational facility; and for site work for a educational facility.

The new 220,000-square-foot Life and Physical Science facility will cater to over 90,000 OSU undergraduate and graduate students over the next 20 years. The funding will address healthcare practitioner shortages across multiple professions: physicians, nursing, pharmacy, physical therapy, dental, veterinary medicine and other critical areas. HB2893 covers fifty percent of the required funding, while OSU has committed to securing the remaining $80 million through private donations. It passed the House 83 – 9 and now heads to the Senate for consideration. As of August 6, 2025, per owner, they are still in conceptual planning. There is no new direction for a possible timeline at this time. House Bill 2893 passed the senate with strong bipartisan support. Approved by Governor June 2024. The bill aims to construct a new state-of-the-art life sciences building to serve as a dedicated classroom home facility for all undergraduate science students. Additionally, it seeks to support the strategic expansion of STEM graduates, enhance the recruitment of top researchers, and bolster the state's STEM-focused industry.

Conceptual

Educational

$160,000,000.00

Public - State/Provincial

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
63
Bidding Soon
1,017
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 1, 2027

Project location map

To Be Determined, Stillwater, OK


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.