Renovation of a municipal facility in Ridgway, Pennsylvania. Completed plans call for the renovation of a municipal facility.

Elk County Courthouse Window Blind Project The County of Elk Reserves the Right Lu Reject Any and All Bids and to Waive Any and All Informalities. Bids May Be Held by the County for a Period Not to Exceed 45 Days Lrom the Date of Opening for the Purpose of Reviewing Hids and Investigating the Qualifications of Bidders, Prior to Awarding the Contract. Contractor is responsible for the accuracy of his/her bids. Any issues related to inaccurate quantity calculations and/or associated cost estimates are the responsibility of the contractor and shall not be covered by the owner. All dimensions provided are for information only and shall be the responsibility of the contractor to verify prior to bid. All blinds are to be roller shades: continuous cord control with fabric wrapped valance with inside mount metal chain. Blinds should be Hunter Douglas or brand equivalent. Fabric to be a solid color and will need varying opacities and openness to be determined by owner. Colors will also be determined by owner. All installation to be included in bid. 1. Inspection and permitting Any permits are the responsibility of the Contactor; however, no permits are anticipated at this time. 2. Courtroom: 8 windows (2 parts each) A. Part1- 110" x 45-3/4" B. Part 2- 49-3/4" x 45-3/4". 3. Other Courthouse Offices and hallways A. (63) 81" x 43-1/2" B. (12) 109-3/4" x 45-3/4" C. (11) 109" x 45-3/4" D. (4) 49-3/4" x 45-3/4" E. (1) 84" x 56" All installation of new equipment shall conform to the manufacturer's installation instructions and be installed in a neat and workmanlike manner. o All construction to be completed per code requirements, accepted construction practices and OSHA standards, ADA requirements and bid specifications. It is the responsibility of the contractor to ensure all requirements are met and maintained throughout construction. o Contractor is responsible for furnishing and installing all the necessary hardware and equipment to complete work. Any damages or alterations to existing materials, equipment and/or utilities not intended for repair/replacement, or not included in the project scope, during construction will be restored or replaced to as near original condition as possible at no additional cost to the owner. o Contractor is responsible for clean-up and disposal of any and all debris. All debris shall be removed from the premises and shall not be permitted to accumulate unless specified by the owner. o All change orders and/or deviations from the bid specifications shall be submitted for approval to the Elk County Commissioners prior to implementation; work shall not commence on these items until written approval has been received. Any work required to restore unauthorized deviations from the bid specifications back to as near original condition as possible shall be the responsibility of the Contractor at no additional cost to the owner. o Contractor shall provide all information pertaining to the proper operation, maintenance, and care of products and systems installed to the owner at the completion of construction. o Owner is not responsible for construction means, methods, techniques, sequences or procedures, or for safety precautions in connection with the Work. The owner will not be responsible for Contractor's failure to perform the Work in accordance with general accepted good construction practices. o Elk County Courthouse offices shall remain open throughout installation. Arrangements are to be made the County Court Administrator, LeeAnn Covac at lcovac@countyofelkpa.com or (814) 776-5375, prior to installation of all blinds so as to maintain County operations o Special arrangements are to be made for installation of blind in the courtroom as to not disrupt any court related activities including but not limited to, jury selection, trials, hearings and/or sensitive Court or police related activities. All arrangements are to be made with LeeAnn Covac, Court Administrator. o Temporary material storage shall be coordinated and approved by LeeAnn Covac, Court Administrator prior to delivery of materials.

Post-Bid

Municipal

$65,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
26
Bidding Soon
559
All Active Projects
244
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 1, 2024

October 31, 2024

img_map_placeholder

300 Center St, Ridgway, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.