BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a road / highway in Mount Pleasant, South Carolina. Completed plans call for site work for a road / highway.

The work will include, but not be limited to, the installation of signal equipment such as signal cabinet, mast arm foundations, mast arms, signal heads, detection, etc. based on the engineering drawings provided. A temporary traffic signal may be required as part of the mast arm foundation installation. The work will also include traffic control during the construction process in accordance with all Town and SCDOT standards for the applicable roadways. The construction time for this project shall be Three Hundred and Ten (310) calendar days from the commencement date in the Notice to Proceed or as determined by lead times by the successful Bidder. This Project is a Work Order construction project and involves the signal upgrade of one (1) signal at SC703 (Ben Sawyer Blvd) & S-51 (Rifle Range Rd/McCants Dr) in Mount Pleasant, South Carolina. Specific Description of the signal work: One (1) signal is to be completely rebuilt or upgraded per the Plans. The contractor is to furnish and install base mounted 332A cabinets assemblies on new foundations including 2070 controller / 2010 conflict IP monitor. The contractor will furnish and install mast arms and foundations, signal heads with back plates, blank-out signs, pedestrian poles, countdown pedestrian heads, push buttons assembly with signs, conductor wire, loops, thermal detection conduit, and splice boxes as shown on the signal plans or as directed by the District Traffic Engineer. Equipment and workmanship shall comply with the Traffic Signal Supplemental Specifications. he Town has elected to upgrade an existing span wire traffic signal to a new mast arm traffic signal at the intersection of Ben Sawyer Boulevard (SC703) and Rifle Range Road/McCants Drive (S-51). SCOPE OF SERVICES The work will include, but not be limited to, the installation of signal equipment such as signal cabinet, mast arm foundations, mast arms, signal heads, detection, etc. based on the engineering drawings provided. A temporary traffic signal may be required as part of the mast arm foundation installation. The work will also include traffic control during the construction process in accordance with all Town and SCDOT standards for the applicable roadways. The construction time for this project shall be Three Hundred and Ten (310) calendar days from the commencement date in the Notice to Proceed or as determined by lead times by the successful Bidder. Unless otherwise indicated in the solicitation, all work elements associated with the traffic signal installation shall comply with the South Carolina Department of Transportation Standard Specifications for Highway Construction, latest edition, Standard Drawings for Road Construction, SCDOT Special Provisions (for) Traffic Signal Installation, latest edition, and the Manual on Uniform Traffic Control Devices, 2023 edition. All costs associated with equipment, installation, mobilization, and traffic control shall comply with the SCDOT On-Call Traffic Signal Cost Estimate Sheet. Mobilization will be billed as a 'per work-order' basis as per the SCDOT standard and shall be 2% of the total work order or a minimum of $200, whichever is greater. Any questions or price disputes shall first be answered by referencing SCDOT's On-Call Traffic Signal Cost Estimate Sheet and if a resolution cannot be made, SCDOT will be contacted to give the final decision. Existing pavements are not designed to support all traffic, machinery, and vehicle types. The successful Offeror shall be responsible for any repairs to existing pavement, be it County, private, or State owned, due to damage from service activities. If it can be proven by the successful Offeror that he was operating within the legal limits, and the damage was not from carelessness or negligence, then he shall not be liable for damages. Written notification/questions must be received no later than 12:00 P.M., October 3, 2024, through the messages tab on the Town's Procurement Portal.

Post-Bid

Roads / Highways

$390,000.00

Public - City

Site Work

7

7

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
52
Bidding Soon
518
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 16, 2024

November 15, 2024

img_map_placeholder

Ben Sawyer Blvd, Mount Pleasant, SC

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.