BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Ninety Six, South Carolina. Completed plans call for site work for a water / sewer project.

Installation of Temporary EQ Tank base, tank, duplex strainer, associated piping and valves, relocation of EQ Pump and Float Switches. Construction Cost Range: $25,000-$30,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Project generally consists ofthe following upgrade and improvements: Confirming existing site conditions Preparation ofEQ Tank base Installation ofEQ tank Installation ofnew duplex strainer Installation ofassociated piping and valves Relocation of existing EQ pump and float switches Bid Documents can be requested electronically by contacting Heather Fields, Office Manager at Ninety Six CPW via email hfields@ninetysixsccpw.com or phone call 864-543-2900.Printed copies of the documents can be requested at a cost of $20 per set. The office hours are Monday through Thursday 8:30am to 5:00pm and Friday 8:30am until 12:45pm. Only those contract drawings, specifications, and bid documents obtained from Ninety Six CPW are official. Bidders cannot rely on the accuracy of copies of the aforementioned documents, drawings, specifications, etc. obtained from any other source. Bidders must be on the official plan holders list for the bids to be accepted by the Owner.

Post-Bid

Water / Sewer

$30,000.00

Public - City

Site Work

5

3

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
54
Bidding Soon
927
All Active Projects
460
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 1, 2024

img_map_placeholder

7213 Ninety Six Hwy, Ninety Six, SC


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.