BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Oceanside, California. Contact the soliciting agency for additional information.

Reference Number: 0000362925 Requests for qualifications (RFQs) for on-call water and sewer hydraulic modeling consulting services on a contractual basis for a period of up to three years, initially, with up to two one-year renewals, for the possible term of five years. Background The Water Utilities Department evaluates new development and re-development projects and their potential impacts to the City's water, sewer, and recycled water systems, in addition to strategic planning and financial management of the Capital Improvement Program (CIP). The current approved budget for fiscal year 2024-25 beginning July 1, 2024 is over $80 million in planned capital improvements. In Fiscal Year 25/26 and 26/27, the Water Utilities Department CIP budget is expected to be $145 million and $170 million, respectively. The costs of department capital improvements range from $10,000 for small projects to more than $50,000,000. Question Deadline 09/25/2024 at 2:00 PM PT, All questions shall be submitted in writing via online . Verbal and telephonic questions shall not receive a response. Scope of Work The general scope of work for WATER impact studies shall include, but not be limited to the following: Task 1: Background Information Review 1. Consultant will review the latest City design and construction manual including the potable water system design guidelines and be familiar with City standards and design criteria. 2. Consultant will review atlas maps, record drawings, as-built drawings, GIS maps and data to become familiar with the City's water system. In some instances, GIS data may be missing or may contain incorrect data for required fields such as pipe diameter, material, length, or 2 appurtenances. A substantial gap analysis, including review and quality control checks of the GIS, need to be conducted to identify missing data, and erroneous input values. The review process may require multiple data exchange iterations with City staff to fill in missing data. Provide findings to update GIS data. 3. Consultant will review the available planning documents for a proposed Project. These documents may include a Project site plan and building plan, proposed connections to the City distribution system, land use data (type of occupancy, number of dwelling units, retail/commercial/industrial square footage, fixture count), irrigated areas, fire flow requirements, and a plan of private on-site water distribution system (if applicable) 4. Consultant will review any recent applicable water studies or water system tests in the project vicinity and will incorporate the findings into the hydraulic model for calibration. 5. Consultant will review the last three years of water use data for the existing parcel(s) as provided by the City (If applicable). 6. Consultant will attend coordination meeting on capital improvement projects that require hydraulic analysis for water or sewer facilities that may include, but not be limited to, pipe capacities, estimated flow or pressure conditions, or impacts to existing system with proposed improvements. The CITY reserves the right to award this project to one firm, several firms or not make an award based on review of proposals, available budget, business needs and other factors that may apply.

Conceptual

Water / Sewer

Public - City

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
218
Active Projects
131
Bidding Soon
2,263
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.