Site work for a power facility in Rochester, New York. Completed plans call for site work for a power facility.

Frank E. Van Lare Water Resource Recovery Facility Standby Generator Equipment Plans and Specifications may be downloaded electronically from the Monroe County Purchasing Division's website or obtained in hard copy in person at the following location upon payment of $50.00 for each set of documents requested: Office of the Purchasing Manager Monroe County, 200 County Office Building, 39 West Main Street Rochester, New York 14614, (585) 753-1100. Refunds may be provided for unmarked Plans and Specifications which are returned to the office of the Purchasing Manager at least seven (7) days prior to the original scheduled bid opening date. Refunds of payment for copies of Plans and Specifications will be provided to those bidders submitting a proposal on the furnished forms, if returned within thirty (30) days from the date of award of contract to the successful bidder. There will be no refund to non-bidders. Bidders who download an electronic copy of the Plans and Specifications are solely responsible for the cost of printing and reproduction, and no refund of these costs shall be provided by the County. Monroe County has policies that Minority Business Enterprises (MBEs) and Women's Business Enterprises (WBEs), and Service-Disabled Veteran-Owned Businesses (SDVOBs) be afforded opportunities to participate as subcontractors on County projects. In furtherance of these policies, the County requires Contractors to utilize their best efforts to achieve goals for MBE, WBE and SDVOD participation on all County projects. Unless otherwise stated in the Special Conditions, the goal for this project is a combined participation by MBE firms on twelve (12%) of the total cost of project and by WBE firms on three (3%) of the total cost of project, and the goal for this project is participation by SDVOB firms on six (6%) of the total cost of project. In the event a CONTRACTOR is a MBE, such CONTRACTOR shall remain subject to the goal of subcontracting at least three percent (3%) of the total cost of services to a WBE and at least six percent (6%) of the total cost of services to a SDVOB. In the event a CONTRACTOR is a WBE, such CONTRACTOR shall remain subject to the goal of subcontracting at least twelve percent (12%) of the total cost of services to a MBE and at least six percent (6%) of the total cost of services to a SDVOB. In the event a CONTRACTOR is a SDVOB, such CONTRACTOR shall remain subject to the goal of subcontracting at least twelve percent (12%) of the total cost of services to a MBE and at least three percent (3%) of the total cost of services to a WBE. In the event a CONTRACTOR is combination of a MBE, WBE or SDVOB, the CONTRACTOR shall choose one of the three designations and shall remain subject to the subcontracting best efforts requirement for the designations not chosen.

Award

Power Plant

$3,294,900.00

Public - County

Site Work

19

11

6

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
56
Bidding Soon
1,308
All Active Projects
635
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 30, 2024

December 30, 2024

img_map_placeholder

1574 Lakeshore Blvd, Rochester, NY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.