BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a civil project in Franklin, West Virginia. Completed plans call for site work for a water / sewer project.

Water Lines and Booster Stations Unit price contract to provide and install 34,240 LF 4-inch water line; 2,280 LF of 3-inch water line; 1,300 LF 2-inch water line; 1,030 LF of directional drills; 152 LF of highway bores; 50 LF of highway open cuts; 80 LF of stream crossings; 24 gate valves; 6 Air Release Assemblies; 9 Flushout Assemblies; 1 80 GPM hydroconstant booster station; 1 50 GPM booster station; and other work required to provide the complete system improvements project. Bid security shall be furnished in accordance with the Instructions to Bidders. Pre-bid Conference There is no Pre-Bid Conference for this project. DBE REQUIREMENTS Each Bidder must fully comply with the requirements, terms, and conditions as set forth in the contract documents to achieve Disadvantaged Business Enterprise (DBE) participation during the performance of this contract. The bidder commits itself to the program for DBE participation and all other requirements, terms, and conditions of the bid conditions by submitting a properly signed bid. The bidder agrees to make "good faith efforts" to sub-contract a portion of the total value of the contract to Disadvantaged businesses. This shall be done in compliance with the six (6) good faith efforts as outlined in 40 CFR 31.36(e). Failure to demonstrate good faith efforts may lead to rejection of bids. For the purpose of this program, the term "subcontractor" includes all construction, modification, and service work contracted for by the bidder in the execution of the work under this contract. Doc info : Digital copies of the Bidding Documents will be delivered by Dropbox. If Dropbox cannot be accepted, a compact disk will be shipped upon payment of the following deposit: Plans and Specifications: Contract No. 1 - Waterline Extension $ 50.00 Question Deadline 10/08/2024 Contact information and submittal procedures for such questions are as follows: Cerrone Associates, Inc., 97-14th Street, Wheeling, WV 26003 - 304-232-5550

Bid Results

Water / Sewer

$515,250.00

Public - County

Site Work

39

28

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
34
Active Projects
15
Bidding Soon
303
All Active Projects
114
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 14, 2024

img_map_placeholder

Multiple Locations, Franklin, WV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.