Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a water / sewer project in Long Beach, Mississippi. Completed plans call for site work for a water / sewer project.
The project includes installation of: Furnishing installing a sewer low-pressure force main consisting of 2 and 3-inch diameter, SDR 21 PVC pipe (solvent weld) and some associated 2, 3, 4, and 6-inch HDPE (IPS and DIPS) DR 13.5 (fusion weld) both casing and carrier pipe, includes all hydrostatic testing; Furnishing and installing the PVC or HDPE pipe service connection from the inline cleanout and service lateral to the new force main tap assembly; Furnish and install HDPE HDD bore with casings for crossing county roads with the LPS force main, includes end seals for casing to carrier pipe; Furnish and install HDD bore for service pipe from the main across the county road to the back side of the county ROW on the opposite side of the county road from the LPS force main to the terminus at the inline cleanout and service lateral (i.e., all service lines will be bored across county roads); Furnish and install inline cleanout (capped) with service lateral at the rear of the county ROW for each proposed service line (i.e., all service lines will terminate with a service lateral kit and inline cleanout assembly with the end capped to allow for future connection to a grinder pump discharge); and, Surface restoration. The work must be conducted in two (2) phases, whereby Phase I will include installing all of the low-pressure sewer force mains inclusive of the service taps, service piping with cleanout and lateral assembly to the edge of the public right-of-way. All testing and restoration of Phase I must be completed, including hydrostatic testing before any efforts are made to begin extending service lines to the structures being served (i.e., Phase II). At present the Owner does not have the easements necessary to provide the Contractor with access to the properties which will be served but will be working on obtaining them during the construction of Phase I. Bid Notes : or for those interested, bids can be electronically submitted at Online BEFORE the accepting time as listed above. For any questions relating to the electronic submittals and/or bidding process, please call Plan House at 228-248- 0181. No oral, telegraphic, telephonic, or e-mail proposals will be considered. Each bidder shall write his Name, his Address, and his Certificate of Responsibility number/or a statement that the bid enclosed does not exceed Fifty Thousand Dollars ($50,000) on the outside of the sealed envelope containing the proposal. If submitting electronically, please include this information on a cover page with your bid submission. All interpretations of drawings and specifications shall be directed to Covington Civil & Environmental, 228-396-0486 or email info@ccellc.us. All questions regarding this bid must be submitted in writing and must be received by the end of business 5:00 p.m. local time October 8, 2024. An acknowledged received copy of all Addenda issued by the Engineer via Plan House must be included with the bid proposal. Pre-bid Conference A pre-bid conference for the Project has not been scheduled at this time; however, if a pre-bid conference is scheduled, all plan holders will be notified by addendum. Attendance at the pre-bid conference is encouraged but not required. Instructions to Bidders Each bid must be accompanied by a Bid Bond or Certified Check in an amount equal to five percent (5%) of his Base Bid, payable to the Harrison County Board of Supervisors, as bid security. In the event that an electronic bid is submitted, a copy of the bid bond must be included with the submission. If submitting electronically, a hard copy of all bid documents must be provided within 3 business days if requested after the bid opening. The successful bidder shall furnish a Performance Bond and a Payment Bond each in the amount of 100% of the bid to be submitted with the executed contracts and Certificate of Insurance. The Owner and Engineer shall be listed as additional insured's on all policies with the waiver of subrogation on all liability policies. Effective July 1, 2010; Per MS Code 31-3-21(3); any bid submitted by a nonresident contractor which does not include the nonresident contractor's current state law pertaining to such state's treatment of nonresident contractors, shall be rejected, and not considered for award. If no such law exists in the nonresident contractor's state, then the non-resident contractor may provide a statement to that effect. The Harrison County Board of Supervisors, reserves the right to reject any and all bids and to waive any informality in the bidding. Bids may be held for a period not to exceed ninety (90) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of Bidders, prior to awarding of the contract. The project is funded by ARPA/MCWI and the requirements for this grant including the procurement process shall be followed including opportunity for participation by minority and women-owned business enterprises in the procurement of goods and services. The Required Attachments for ARPA/MCWI Construction Contracts are included in these contract documents.
Post-Bid
Water / Sewer
$400,000.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 15, 2024
November 14, 2024
Beatline Rd, Long Beach, MS
Related To This Project
Long Beach, MS
Bid Date: Dec 17 2024
Long Beach, MS
Bid Date: Dec 17 2024
Long Beach, MS
Bid Date: Dec 17 2024
Long Beach, MS
Bid Date: Nov 07 2024
Long Beach, MS
Bid Date: Nov 26 2024
Long Beach, MS
Bid Date: Nov 18 2024
Long Beach, MS
Bid Date: Nov 19 2024
Long Beach, MS
Bid Date: Nov 18 2024
Long Beach, MS
Bid Date: Jul 10 2024
Long Beach, MS
Bid Date: Jul 23 2024
Long Beach, MS
--
Long Beach, MS
Bid Date: Apr 09 2024
Long Beach, MS
Bid Date: Apr 09 2024
Long Beach, MS
Bid Date: Jan 30 2024
Long Beach, MS
Bid Date: Nov 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.