BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 12, 2024 at 7:00 PM

Updated November 13, 2024

Site work and paving for a mixed-use development in Westminster, Colorado. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Reference Number 0000363052 Job Location: 9650 N. Sheridan Blvd. Hyland Hills Park and Recreation District is seeking bids for bridge skirting and railing repairs on 2 bridges at the Greg Mastrionia Golf Course Lake 8. The Lake 8 Bridge crosses a pond at hole # 8 at the Greg Mastriona Golf Course. Photos of the existing bridge are included. Bidders are requested to examine current conditions, measure for quantities and provide recommendations for repair according to the following descriptions: The existing bridge has wooden skirting below the deck and wooden runners on the railing. The existing posts and rails are metal and appear to be in good condition. The skirting is to be replaced with powder coated or similar pre coated metal panels. The wooden frame behind the panels appears to be in good condition. It should be inspected and repaired as needed. The metal brackets behind the frame appear to be in good condition. should be inspected and repaired as needed. All existing metal frames, brackets, attachments and other metal pieces are to be sanded or sandblasted and recoated. Specs for coating will be provided. The wooden runners on the railing are to be replaced with vertical metal pickets. The gap between pickets is to be 4" or less. A second shorter bridge crosses the Farmers Highline Canal near the pond. It will be repaired in the same manner as the Lake 8 bridge, with the exception of the skirt. This bridge does not currently have a skirt or brackets, but should be added. Railing repairs will be included. Include a description of recommended repairs, how repairs are to be made, quantities of materials and recommended repairs. Provide cut sheets and or spec sheets on materials to be used. Question Deadline 10/04/2024 at 4:00 PM MT Questions are submitted online Yes, Questions will be answered electronically thru Online. Submit questions to sheger@hylandhills.org Bonding Requirements - Performance Bond 100 % - Payment Bond 100 % 100% Performance and Payment Bonds will be required from the awarded bidder for bids over $50,000.00 60 calendar days will be allowed for completion. $500.00 per day liquidated damages will apply for late completion.

Award

Bridges / Tunnels

$296,563.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
0
Bidding Soon
829
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

November 11, 2024

Project location map

9650 Sheridan Boulevard, Westminster, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.