BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tahlequah, Oklahoma. Completed plans call for the renovation of a educational facility.

MPEC Gym Floor Strip, Paint and Reseal. Estimated Project Cost: $45,000 Description: Work Summaries The following Contract (Bid Group) Work Summaries describe the intended scope of work to be included in the Bid Package. The bid shall include all the requirements of the plans with specifications unless specifically indicated otherwise in this summary. This includes all layout and daily clean up involved with the work. It is the bidder's responsibility to review bidding requirements and forms to insure a complete, safe, and coordinated execution of the Work Package being quoted. Additionally, bidders shall include in their pricing applicable portions of related specification sections normally associated with the work to be done whether specifically indicated by this Contract Work Summary or not. Should any bidder be unclear as to the scope of work required, he is instructed to contact the Owner for resolution prior to bidding. In the absence of written instruction to the contrary, in matters of specification and/or scope of interpretation, bidders shall include the more costly and complete of the possible interpretations. Awarding of Contracts will be based on the best qualified bid. CONTRACT: General Construction Work including but not limited to the following: 1) Drawings and Specifications as identified in Contract Attachment "B." 2) All work to be completed prior to November 4th 2024 3) Access to the project site will be through the rear loading dock overhead door and adjacent walk doors. 4) Contractor will be responsible for cleaning and protection of all adjacent finishes affected by this scope of work 5) Paint an Sealer product must be recommended for Wood Gym Flooring and submitted with this bid 6) Playing surface is a "removable" gym floor in 4' x 8' panels. Contractor should be aware and bid the labor accordingly to address mechanical fasteners during the sanding and installation process. (see site photos) Including But Not Limited To: 1) NSU is a "Tobacco Free" campus; Contractor will be expected to abide by NSU policy and will be held accountable for all Subcontractors on site. 2) Contractor shall be responsible for coordination of all necessary local, state and federal, pre, during and post compliance inspections. Contractor shall provide NSU with documentation of compliance at completion of work. 3) Contractor to be responsible for all permits and fees associated with this scope of work. 4) Work may be halted and resumed at any given time according to NSU's needs. 5) Contractor shall be responsible for mobilization and staging locations to minimize daily operations of the university. 6) Utility terminations shall be in accordance with the governing utility procedures and regulations. NSU will be given a minimum of 24 hours' notice prior to any utility outages/shut-offs. 7) Contractor shall be responsible for coordinating any and all utility locations for the project. 8) Contractor is responsible for furnishing, receiving, protecting and installing specified materials per the construction documents. 9) Contractor is responsible for all field verifications of dimensions and conditions. 10) Contractor is to ensure that construction trash and demolished debris is gathered and disposed of daily in contractor provided trash receptacle. 11) Contractor is responsible for daily clean-up and equipment storage. NSU is not responsible for damaged or stolen property and/or equipment. 12) Contractor shall be responsible for abiding OSHA and NSU safety regulations. 13) Contractor shall be responsible for protection of existing equipment and materials that are not called out to be demolished or repaired. 14) Any discrepancy between the plans/specifications and actual field conditions must be submitted in writing to the owner a minimum of 48 hours prior to the bid closing date. 15) Contractor shall be responsible for demolition, removal, loading and haul off of all materials, scraps and debris. 16) Contractor shall be responsible for repairing rutted or furrowed greenspace, by means of fill dirt and sod, as deemed necessary by the owner. 17) Contractor shall be responsible for any broken or crushed concrete sidewalks, curbs, decks, walls or other cementitious materials. 18) Contractor shall not interfere with building exits or egress paths of any occupied buildings. 19) Contractor shall maintain a site supervisor at all times when the contractor has a presence on campus. 20) Contractor shall be responsible for Final Cleaning. This will be to the Owner's discretion. 21) Contractor shall be responsible for and acknowledge all plans, specifications, and details as shown in all bidding documents. 22) Contractor shall provide Owner training for operations and maintenance of new equipment and systems. 23) Contractor shall supply accurate "red-line" drawing to Owner prior to final payment. Site Address: 1041 N Grand Ave. Site Directions: Tahlequah Campus at the Multipurpose Event Center at 1041 N Grand Ave, Tahlequah, OK. 74464 Question Deadline 09/29/2024 Any RFI's must be submitted in writing 72 hours prior to the bid opening. All questions shall be furnished in writing to: Northeastern State University Attention: Christopher Gay gayc@nsuok.edu

Post-Bid

Educational

$45,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
98
Active Projects
64
Bidding Soon
759
All Active Projects
299
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 3, 2024

October 28, 2024

img_map_placeholder

1041 N Grand Ave, Tahlequah, OK

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.