Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published November 7, 2024 at 7:00 PM

Updated November 8, 2024

Renovation of a mixed-use development in Sedalia, Missouri. Completed plans call for the renovation of a stadium.

The Sedalia School District #200 is seeking bids for concrete work at a few District locations. The areas include new concrete in the stadium and the band dock loading area at Smith-Cotton High School. A second location is at the Smith-Cotton Junior High where additional concrete will be utilized for dumpster and shed placement. The third is at the Sedalia Middle School, concrete will be added near the loading dock area. The Sedalia School District #200 reserves the right to refuse and/or reject any and all bids. Timeframe for the projects will be from September 2024 - December 20. 2024

Award

Arenas / Stadiums

$213,135.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
54
Bidding Soon
1,041
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed