Site work for a civil project in Saratoga Springs, New York. Conceptual plans call for site work for a water / sewer project.
The Village of Saranac Lake is seeking to contract with a qualified firm or consultant team for the engineering, design, and permitting for a sewer collection system and various Sewer Treatment Plant upgrades. The Village has issued a Request for Qualifications (RFQ) to identify firms with the interest, expertise, and capacity to assist the Village with this necessary infrastructure project. Service-Disabled Veteran-Owned Set Aside: No The Village of Saranac Lake owns and operates a central sewer collection and wastewater treatment system serving the incorporated Village and surrounding areas adjacent to the Village in the Townships of St. Armand, North Elba, and Harrietstown. The sewage collection for the Village consists primarily of gravity sewers, with some collection system pumping stations and associated force-mains and a main lift station that pumps the collected gravity and pumped to flow to the Water Pollution Control Plant. These pumping stations tend to serve the far extents of the Village/adjacent Townships. The Village WPCP is an activated sludge plant that consists of preliminary treatment, primary treatment, secondary treatment through traditional activated sludge and secondary clarification, and UV disinfection with a discharge of treated effluent to the Saranac River. The Village operates the collection and treatment system in accordance with New York State DEC State Pollution Discharge Elimination System, including those areas with service agreements located outside the Village. After completing the tertiary disinfection system, the village is looking to continue upgrades to keep the plant working at peak performance and as efficient as possible. Scope of Work The scope of work for the project includes, but is not necessarily limited to, the following tasks: 1. WPCP upgrades, including pumping, preliminary treatment, primary treatment, secondary treatment, tertiary treatment, septage receiving, solids handling, solar, controls, civil structural, HVAC, plumbing, electrical, and all work associated that is required to complete the upgrades. 2. Engineer and design projects for both the Collection system and Wastewater Treatment Plant 3. Sewer collection and trunk mains, including road repairs and restoration, including the trunk sewer main, swamp line, the other sewer mains identified in the engineering report as determined by the Village per allowable funding. Inquiries All inquiries should be directed to: Bachana Tsiklauri Village Manager Village of Saranac Lake 3 Main Street, Suite 1 Saranac Lake, NY 12983 (518) 891-4150 ext.205 The method of Contractor Selection has not been Determined at this time.
Conceptual
Water / Sewer
$300,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 4, 2025
Multiple Locations, Saratoga Springs, NY
Related To This Project
Saratoga Springs, NY
Bid Date: Oct 01 2024
Saratoga Springs, NY
Bid Date: Oct 01 2024
Saratoga Springs, NY
Bid Date: Oct 08 2024
Saratoga Springs, NY
Bid Date: Oct 16 2024
Saratoga Springs, NY
Bid Date: Oct 16 2024
Saratoga Springs, NY
Bid Date: Oct 16 2024
Saratoga Springs, NY
Bid Date: Oct 22 2024
Saratoga Springs, NY
Bid Date: Oct 22 2024
Saratoga Springs, NY
Bid Date: Oct 10 2024
Saratoga Springs, NY
Bid Date: Oct 10 2024
Saratoga Springs, NY
Bid Date: Oct 10 2024
Saratoga Springs, NY
Bid Date: Oct 03 2024
Saratoga Springs, NY
Bid Date: Oct 03 2024
Saratoga Springs, NY
--
Saratoga Springs, NY
Bid Date: Sep 18 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.