BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2025 at 8:00 PM

Updated August 22, 2025

Site work and paving for a mixed-use development in Rainbow, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; bridge / tunnel; bridge / tunnel; and water / sewer project.

Install 3,475 linear feet of subsurface wetland channels, upsize storm drains, improve driveways and sidewalk, and upgrade existing culverts along 5th Street and Huffstatler Street. As of August 21, 2025, this project is under construction. An engineer and general contractor have been selected. Per the owner, construction started in February 2025 and a timeline for completion has not been determined.

Under Construction

Roads / Highways

$13,480,000.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
164
Active Projects
1
Bidding Soon
1,835
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 3, 2025

Project location map

Huffstatler St & 5th St, Rainbow, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.