Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published March 20, 2026 at 8:00 PM
Updated March 21, 2026
Demolition, site work, paving and new construction of a civil project in Vance, Alabama. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; and road / highway.
Modification of the Sr-216 and I-20/59 Interchange at Exit 100 to a Diverging Diamond and Bridge Replacement of Bin 008904 Over I-20/59 Type of Work: Diverging Diamond Project Length in Miles 0.712 Route SR-216 County: Tuscaloosa As of March 20, 2026, the project is in Conceptual status. Anticipated letting Year is 2027. ALDOT - Additional Lanes and Bridge Replacement on SR-216 *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$20,091,000.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
AL-216, Vance, AL
Related To This Project
Vance, AL
Bid Date: Jan 27 2026
Vance, AL
--
Vance, AL
Bid Date: Mar 18 2025
Vance, AL
Bid Date: Oct 22 2024
Vance, AL
Bid Date: May 15 2025
Vance, AL
--
Vance, AL
Bid Date: Aug 29 2024
Vance, AL
Bid Date: Jun 17 2024
Vance, AL
Bid Date: Apr 25 2024
Vance, AL
Bid Date: Sep 03 2021
Vance, AL
Bid Date: Jun 06 2024
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
