BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 3, 2024 at 8:00 PM

Updated October 4, 2024

Site work and paving for a road / highway in Rock Valley, Iowa. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work will consist of the construction of approximately 600 C.Y. Topsoil, Off-Site; 460 C.Y. Excavation, Class 10; 2,906 S.Y. PCC Pavement, 7" and other related construction work. Location Details City: Rock Valley County: Sioux State/Province: IA The successful Bidder will be required to furnish performance and payment bonds each in an amount equal to one hundred percent (100%) of the contract price, said bonds to be issued by a responsible surety approved by the Owner, and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment of all material and labor and protect and save harmless the Owner from claims and damages of any kind caused by the operations of the Contractor and shall also guarantee the maintenance of all improvements for a period of two (2) years from and after the completion and acceptance of the Owner. Construction work for the 300th Street Paving Repairs project and work incidental thereto, as described in the Plans and Project Manual therefor, now on file in the office of the City Administrator. The Owner hereby reserves the right to reject any or all bids, to waive informalities and to enter into contract with the lowest, responsive, responsible Bidder. Est. Completion Date: Nov. 30, 2024

Bid Results

Roads / Highways

$234,918.00

Public - City

Paving, Site Work

9

12

5

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
57
Bidding Soon
514
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2024

October 30, 2024

Project location map

300th St, Rock Valley, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.