BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Mission, Texas. Completed plans call for site work for a playground / park / athletic field.

The City of Mission is accepting bids, from a contractor(s) to provide the following services for Purchase and Installation of Golf Ball Protective Netting for the All-Inclusive Lions Park. The City if looking for qualified contractors to provide and install 600 ft of golf ball protective netting and utility poles as needed to protect the All-Inclusive Playground, Splash Pad and associated areas from stray golf balls from neighboring golf course. Completion/Acceptance of Purchase and Installation of Golf Ball Protective Netting should not exceed fortyfive (45) calendar days. Exceeding the number of days shall result in rejection of bid. And the CONTRACTOR agrees that time is the essence of this contract, and that for each day of delay beyond the number of working days herein agreed upon for the completion of the work herein specified and contracted for (after due allowance for such extension of time as is provided for under Extension of Time herein) above the OWNER may withhold permanently for the CONTRACTOR'S total compensation the sum of two hundred fifty Dollars $250.00/per day __ as stipulated damages for such delay. This solicitation may be cancelled by the City before or after receipt of bids or proposals (as applicable). The bidder is specifically advised that the bid must be accompanied by a bid bond from a reliable surety company licensed to operate in the State of Texas, totaling five percent (5%) of the total amount of the bid, as a guaranty that if awarded the bid, the bidder shall meet all specification requirements and delivery date(s). A certified cashier's check will be allowed in lieu of a bid bond for five (5%) of the total amount for the project. All required bonds shall be provided in an amount equal to one hundred percent (100%) of the contract amount. Performance Bond. The Contractor shall provide a Performance Bond if the contract amount exceeds $100,000. Payment Bond. The Contractor shall provide a Payment Bond if the contract amount exceeds $25,000.

Bid Results

Playgrounds / Parks / Athletic Fields

$83,700.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
24
Active Projects
12
Bidding Soon
284
All Active Projects
129
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 15, 2024

November 15, 2024

img_map_placeholder

1308 E Kika De La Garza Loop, Mission, TX

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.