BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2024 at 8:00 PM

Updated October 8, 2024

Remodeling of an educational facility in Ames, Iowa. Completed plans call for the remodel of a educational facility.

Remodel Restroom 2225 and 2221 replace existing sink and countertop. This project includes, but is not limited to, architectural and mechanical work. Refer to the Drawings and Technical Specifications for complete scope of Work. Project Location. Iowa State University Campus: 1600 S 16th St., Ames IA 50011 The milestone dates specified are for specific items critical to maintaining the project schedule. These milestone dates shall be incorporated in the Contractor's coordination and planning. Projected Notice of Award 09/26/24 Construction Start Date 12/20/24 Execution of Contract 10/03/24 Final Completion 01/20/25 Cost Estimate: $118,030 TSB goal: 10%

Award

Educational

$98,605.00

Public - State/Provincial

Remodeling

3

5

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
101
Bidding Soon
1,191
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 23, 2024

December 20, 2024

Project location map

1600 S 16th St, Ames, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.