BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in San Antonio, Texas. Working plans call for site work for a water / sewer project.

This project will be procured through the Request for Competitive Sealed Proposal (RFCSP) alternative construction delivery method and is tentatively scheduled to be advertised Second Quarter 2025. Please submit questions and/or comments by October 2, 2024 at 4:00 PM (CDT). Answers to the questions will be posted to the web site by October 8, 2024 at 5:00 PM (CDT). To obtain additional information about the project, ask questions, or provide comment, contact Janie M. Powell at 210-233-2443 or via email at Janie.Powell@saws.org. The Steven M. Clouse Water Recycling Center (SMCWRC) is the largest of the three (3) wastewater treatment plants SAWS owns and operates, and is located at 3495 Valley Rd. San Antonio, TX 78221. The plant has been in operation since 1987. Estimated construction budget is $100,000,000.00. Estimated advertisement in 2nd quarter of 2025 Estimated Construction start in 3rd Quarter of 2025 This project will expand the capacity of and improve the hydraulics at the secondary treatment area including the Stage 2 aeration basins and settling tanks and will also replace the aeration blowers. The 2050 flows to the facility are projected to be 128 mgd on an average basis and 396 mgd on a peak 2-hr basis. The existing capacity of the Stage 2 aeration basins and settling tanks will be improved to meet the 2050 flow and load requirements. The existing positive displacement blowers will be replaced to meet the current and future air demands for an effective aeration process and improved energy efficiency. The SMCWRC Primary Treatment Expansion Project will address Primary Clarifiers and Stage 1 expansion. The scope of this project includes: Additional Stage 2 aeration basins and settling tanks, and associated piping and sludge collection systems Replacement of the existing process air blowers Upgrades to the electrical and SCADA systems associated aeration systems and blowers/blower building Adequate levels of system automation, controls, and instrumentation to optimize operation and performance; and All associated site civil, mechanical, structural, electrical, and I&C work for these expansion and upgrades The method of Contractor Selection has not been Determined at this time.

Final Planning

Water / Sewer

$100,000,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
23
Bidding Soon
1,797
All Active Projects
712
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 17, 2024

img_map_placeholder

3495 Valley Rd, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.