Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 12, 2024 at 8:00 PM

Updated October 13, 2024

Site work and environmental remediation for a water / sewer project in Fort Smith, Arkansas. Completed plans call for site work for a water / sewer project; and for environmental remediation for a water / sewer project.

2016 SSA Remedial Measures, Sub-Basin S007. Description: This project includes approximately 3,794 linear feet of 8-inch and 200 linear feet of 12-inch diameter sanitary sewer line replacement by open cut methods; 5,548 linear feet of 8-inch sanitary sewer line replacement by pipe burst methods, 2,331 linear feet of 8-inch and 603 linear feet of 12-inch remediation by CIPP; the installation of 73 clean outs; the replacement of 27 48-inch diameter manholes; the lining of 38 manholes; and the replacement of 17 manhole frame and covers.

Post-Bid

Water / Sewer

$2,000,000.00

Public - City

Environmental Remediation, Site Work

75

8

87

6

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
77
Bidding Soon
818
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 11, 2024

December 10, 2024

Project location map

Multiple Locations, Fort Smith, AR


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed