Published October 15, 2024 at 8:00 PM

Updated October 1, 2024

Site work, paving and renovation of a civil project in Marble Rock, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; and for the renovation of a water / sewer project.

The extent of work on this project is the furnishing of all necessary labor, supervision, equipment, tools, and materials for the construction of improvements in Marble Rock, Iowa, generally described as follows: 1. Contract I - Water Tower (located in City Park off of River Street) - Awarded to Classic Protecting Coatings $536,825 a. Rehabilitation of 100,000-gallon Hydrocone pedestal type water tower. b. Tree removal and perimeter fencing. c. Well house rehabilitation. d. Chlorine system rehabilitation. e. All modifications shown on the Drawings. 2. Contract II - Water Meters (City-wide) - Awarded to Ferguson Waterworks $79,933 a. Replacement of all water meters in system. b. Provide AMR reading system software and hardware. 3. Contract III - Water Main (along Park Street and Hutches Street) Awarded to Wunsch Construction $406,799 a. Installation of 6" water main. b. Gate valves and boxes along with hydrants. c. Pavement and restoration Work includes, but is not limited to, to the construction of site work, electrical/mechanical work associated with the improvements, as well as start-up services and restoration. Doc Note - Electronic and paper copies of the Bidding Documents may be obtained from the Issuing Office of SEH located at: Short Elliott Hendrickson Inc. 10 North Washington Avenue, Suite 110 Mason City, Iowa 50401 641.424.6344 A refundable deposit of $150.00 will be required for the Plans and Project Manual. In order to receive a refund, both Plans and Project Manual must be returned in complete and re-useable condition. In addition, they must be returned in said condition within fourteen days after award of the project. Failure to comply with either requirement will result in forfeiture of the deposit. Contract I - Water Tower Early Contract Commencement Date February 1, 2025 (Mobilize, hydro tank setup, testing, tree removal, building rehab, etc.) Project shall commence on May 15, 2025 (Water tower taken offline) Substantial Completion 60 calendar days from May 15 Final Completion 90 calendar days from May15 Contract II - Water Meters Substantial Completion October 31, 2025 Final Completion November 28, 2025 Contract III - Water Main Substantial Completion October 31, 2025 Final Completion November 28, 2025 Each bid must be made out on a Bid Form furnished in the Project Manual and obtained from SEH or on a computerized Bid Form furnished by the bidder. Bid Forms furnished by the bidder shall replicate the Bid Form furnished in the Project Documents Manual. Each bid shall be sealed in an envelope marked "Bid for the 2024 Water System Improvements Project". Each bid must be accompanied in a separate envelope by a bidding check or bid bond in an amount equal to five percent (5%) percent of the bid price, said check being either a certified or cashier's check, drawn on a bank in Iowa, or a bank chartered under the laws of the United States, or a Certified share draft drawn on a credit union in Iowa or chartered under the laws of the United States, and made payable to the City of Marble Rock, Iowa, as security that the bidder will furnish the required bonds and enter into a contract within ten (10) working days, excluding Saturday, Sunday, and holidays, after the award of the contract to him. The City of Marble Rock reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the City of Marble Rock. Davis-Bacon and Related Acts and federal prevailing wage rates apply to this project. All provisions relative to those acts must be met.

Award

Water / Sewer

$486,732.00

Public - City

Paving, Renovation, Site Work

19

18

7

10

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Site Remediation, Chemical Decontamination
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Earthwork Methods, Soil Stabilization
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Common Work Results for Exterior Improvements, Bases, Ballasts, and Paving, Aggregate Surfacing, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding, Sodding, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Communications Utilities, Communications Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
33
Bidding Soon
579
All Active Projects
201
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 9, 2024

February 1, 2025

img_map_placeholder

Multiple Locations, Marble Rock, IA

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2024 Water System Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.