BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Rich Fountain, Missouri. Completed plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and for the demolition of a bridge / tunnel.

The proposed work includes the construction of 92 ft-6 in. long by 24.5 ft wide single span bridge, 0 degree skew with a concrete deck, steel I-Girders, and concrete abutments on driven steel H-piles located on County Road 625, over Swan Creek in Osage County MO. All bidders must be on MoDOTs Qualified Contractor List per Section 102.2 of the Missouri Standard Specifications for Highway Construction, 2023 Edition including all revisions. The contractor questionnaire must be on file 7 days prior to bid opening. No bidder may withdraw his bid within 90 days after the actual date of the opening thereof. Any questions regarding the project, plans, specifications, or bid documents should be directed to Aaron McVicker of McClure, at 660-415-4007 A certified or cashiers check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE goal for this project is 3%. No 2nd tier subcontracting will be allowed on this project. MODOT - Osage County Bridge Replacement

Bid Results

Bridges / Tunnels

$654,744.00

Public - County

Demolition, New Construction, Paving, Site Work

28

14

2

6

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
60
Active Projects
33
Bidding Soon
531
All Active Projects
208
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 17, 2024

December 16, 2024

img_map_placeholder

Multiple Locations, Rich Fountain, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.