Published November 20, 2024 at 7:00 PM

Updated October 1, 2024

Renovation of a mixed-use development in Wappingers Falls, New York. Completed plans call for the renovation of a educational facility.

The Work is scheduled to start upon award of contract and is subject to the Milestone Schedule contained in the Project Manual - Specification Section 011200 - Multiple Contract Summary. HM.2 Budget: $350,000 The work will be bid in five Contracts. General Work - Contract GW.2 HVAC Work - Contract HVAC.2 Plumbing Work - Contract P.2 Electrical Work - Contract E.2 Hazardous Materials Abatement - Contract HM.2 Document Notes : Complete sets of Bidding Documents, Drawings and Specifications, may be obtained from REVplans, 28 Church Street, Unit 7, Warwick, NY 10990 Tel: 1-877-272-0216. Checks or money orders shall be made payable to the Wappingers Central School District. Plan deposit is refundable in accordance with the terms in the Instructions to Bidders to all submitting bids. Any bidder requiring documents to be shipped shall make arrangements with the printer and pay for all packaging and shipping costs, Plan holders who have paid for hard copies of the bid documents will need to make the determination if hard copies of the addenda are required for their use, and coordinate directly with the printer for hard copies of addenda to be issued. There will be no charge for registered plan holders to obtain hard copies of the bid addenda. Each bid shall be prepared and submitted in accordance with the Instructions to Bidders, on the Bid Form bound within the Project Manual. Bidders shall be required to certify on the Bid Form that Bid prices have been arrived at without collusion. Bid Security in the amount of five percent (5%) of the Bid must accompany each bid in accordance with the Instruction to Bidders. One hundred percent (100%) Labor and Material Payment Bond and one hundred percent (100%) Performance Bond will be required of the successful bidder prior to signing the contract. The Owner reserves the right to consider all Bids for a period of forty five (45) days following the bid opening before awarding the Contract, and reserves the right to waive any informalities or to reject any and all Bids. Attention of bidders is particularly called to the requirements as to equal employment opportunity, prevailing wages, and all other Federal, New York State and local requirements.

Award

Educational

$279,665.00

Public - County

Renovation

97

11

59

5

Subscribe For Documents

69 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Quality Control, Testing and Inspecting Services, Temporary Facilities and Controls, Temporary Utilities, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Structure Demolition, Facility Remediation, Transportation and Disposal of Hazardous Materials, Asbestos Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Wood Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Specialty Doors and Frames, Panel Doors
Division 09 - Finishes

Division 09 - Finishes

Tiling, Ceilings, Wall Finishes, Wall Coverings, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Insulation, HVAC Air Distribution, HVAC Ducts and Casings, Air Duct Accessories, Dampers, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Electrical, Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Batteries, Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Bulk Material Feeders, Feeders

Find More Local Projects

Within 75 Miles of This Project
523
Active Projects
338
Bidding Soon
4,872
All Active Projects
2,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 24, 2024

November 12, 2024

img_map_placeholder

Multiple Locations, Wappingers Falls, NY

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

2023 District Wide Renovations - Phase 2-Contract HM.2

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.