Site work for a water / sewer project in Braintree, Massachusetts. Completed plans call for site work for a water / sewer project.

Braintree - Sewer System Rehabilitation - Year 11 Sewer System Rehabilitation - Year 11 The scope of work for Base Bid includes construction of approximately: 250 vertical feet of cementitious lining of manholes; furnish and install manhole inflow dish in four (4) manholes; install internal drop connection at one (1) sewer manhole; raise manhole frame and cover to grade at five (5) manholes; 7,150 linear feet of cured-in-place pipe; three (3) lateral liners; location and inspection of five (5) sewer manholes; and other related tasks. Disadvantaged Business Enterprise (DBE) goals and Equal Employment Opportunity policies of the Massachusetts Water Resources Authority (MWRA) and the Town of Braintree are applicable to the total dollars paid to the construction contract. The goals for this project are a minimum of 5.00 percent D/MBE Participation or any combination of the two. All DBES shall be certified by the commonwealth of Massachusetts under the provisions certified by the supplier diversity office (SDO). Note that these DBE amounts are goals, not strict requirements. Every request for such interpretation should be in writing (typed, not handwritten) addressed to Weston & Sampson Engineers, Inc., 55 Walkers Brook Drive, Reading, Massachusetts 01867 Attention: CSD, or sent via email to Mahoney.Carolyn@wseinc.com and to be given consideration must be received at least ten working days prior to the date fixed for the opening of bids. PURPOSE OF LOGS: 1. The purpose of the Television and Manhole Inspection Logs was to determine the condition of the existing sewer system and assess the extent of cleaning, repairs and/or replacement required for the system. 2. The inspections and observations provided information to prepare the design specifications included in these contract documents and to meet the requirements of the Owner. 3. Information reported in the Television and Manhole Inspection Logs are those observed in the field at the particular location and time the observations were made, and do not necessarily represent the present conditions. 1.02 SCOPE: A. TELEVISION INSPECTION LOGS: 1. Television inspection of existing pipelines has been performed, with reasonable care. The results of the inspection program are appended hereto and are a part of the Contract Documents. Videos of what was encountered at the time of the inspection may be seen by appointment, upon request, during the bidding period at the office of Weston & Sampson Engineers, Inc., 100 Foxborough Boulevard, Foxborough, MA 02035. Contractors may, after obtaining Owner's permission, carry out additional pipeline inspection, at no expense to the Owner. 2. Television Inspection Logs provided in Attachment A of these Contract Documents are limited by the methods used for obtaining and expressing such data, and is subject to various interpretations. The terms used to describe conditions encountered are subject to local usage and individual interpretation. 3. Television inspections have been taken substantially at the locations indicated on the drawings and shown on the logs. Information presented in the inspection logs, as to the pipe condition, material build up in the pipe; etc. is based on visual observation from the videos. Information reported on the Television Inspection Logs are those observed in the field at the particular location and at the time the videos were taken, and do not necessarily represent the present conditions. Condition of the pipeline, material build up in the pipe, and other factors may differ now from those originally observed. Contractors should be aware that present conditions might affect methods of construction. B. MANHOLE INSPECTION LOGS: 1. Manhole inspections of existing manhole structures have been performed, with reasonable care. The results of the inspection programs are appended hereto and are a part of the Contract Documents. Photographs of what was encountered in the manholes at the time of the inspection may be seen upon request during the bidding period at the office of Weston & Sampson Engineers, Inc., 100 Foxborough Boulevard, Foxborough, MA. Contractors may, after obtaining Owner's permission, carry out additional manhole inspections at no expense to the Owner. 2. Manhole Inspection Logs provided in Appendix B of these Contract Documents are limited by the methods used for obtaining and expressing such data and is subject to various interpretations. The terms used to describe conditions encountered are subject to local usage and individual interpretation. 3. Manhole inspections have been taken substantially at the locations indicated on the drawings and shown on the logs. Information presented in the inspection logs, as to extent of manhole failure, infiltration rates; material build up in the manholes; etc. is based on visual observation. Information reported on the Manhole Inspection Logs is those observed in the field at the particular location and at the time observations were made, and do not necessarily represent the present conditions. Condition of the manholes, infiltration rates, and material build up in the manholes, and other factors may differ now from those originally observed. The Contractors should be aware that present conditions might affect methods of construction.

Bid Results

Water / Sewer

$488,215.00

Public - City

Site Work

11

7

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
342
Active Projects
221
Bidding Soon
2,598
All Active Projects
1,193
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

img_map_placeholder

Multiple Locations, Braintree, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.