Published March 4, 2025 at 7:00 PM
Updated March 5, 2025
Demolition, site work, renovation and addition to a medical facility in Barrys Bay, Ontario. Completed plans call for the addition of a 6,000-square-foot, two-story above grade medical facility; for the demolition of a medical facility; for the renovation of a 6,000-square-foot medical facility; and for site work for a medical facility.
PART 1: This part of project consists of two phases. Phase 1 is the construction of the new Emergency Department addition, embankment stabilization, and temporary gravel parking lot. This area is approximately 6,000 sq.ft excluding exterior works. Phase 2 encompasses the renovation of a portion of the existing building, the main Entrance and Ambulatory Care areas - approximately 7,860 sq.ft, as well as the construction of a new heliport. In both phases there will be intermediate stages of work to permit the continuous operation of the hospital. Some will necessitate work stoppages to allow the hospital to relocate operations. The General Contractor shall co-ordinate with the hospital with respect to this. PART 2: The slope rehabilitation project involves a 170m span, requiring sub-excavation to a 1:1 slope and replacement with R-50 rip-rap material underlain with geotextile to achieve a minimum 1.75:1 slope. The rip-rap will be 500mm thick at the top, increasing in thickness down the slope, and keyed into existing material at the toe to a depth of 600mm and a length of 900mm. The rip-rap plan area covers approximately 1925m2, with an additional 3515m2 area to be grubbed for material removal and slope preparation. Additional work includes relocating a fence section and constructing rip-rap pads at storm outfall outlets. Additionally, an area of approximately 2,000 square meters on the north side of the hospital site to be graveled and prepared for temporary parking. Work at the site is to commence: Two weeks after letter of intent has been issued by St. Francis Memorial Hospital Substantial Completion of Phase 1 is required by: February 20, 2026 Substantial Completion of Phase 2 is required by: March 31, 2027 Completion of the entire facility is required by: March 31, 2027 Question Deadline 11/28/2024 Direct all inquiries to the Project Architect N45 Architecture Inc 71 Bank Street, 7th Floor Ottawa, Ontario K1P 5N2 attn. Babak Gholizadeh Babakg@n45.ca t. 613.224.0095 x234 f. 613.224.9811
Award
Medical
$16,470,000.00
Public - State/Provincial
Addition, Demolition, Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 10, 2024
March 10, 2025
7 St Francis Memorial Dr, Barrys Bay, ON
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.