BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 23, 2025 at 8:00 PM

Updated May 24, 2025

Site work and new construction of an educational facility in Grand Junction, Colorado. Completed plans call for the construction of a educational facility.

As of May 23, 2025, foundation work began in January 2025. All trades have been awarded. The previous solicitation is for reference purposes only. Reference Number 0000362999 Job Location: Colorado Mesa University Main Campus 1100 North Avenue Grand Junction, Colorado United States 81501 Colorado Mesa University welcomed its largest class of in-coming freshman and new to CMU students on August 16, 2024. The number of new freshmen increased by 30% while overall growth in enrollment is hovering around 6%. Increased enrollment results in greater demand for on-campus housing, especially with the current high cost and scarcity of affordable housing opportunities for students competing with the public in the surrounding area for off-campus housing. Current high rental costs in the community have added another layer of complexity for students wanting to live off campus as well, thus placing a higher demand for on-campus housing that presents a more affordable solution. This current phase of student housing proposes between 316 and 324 beds in a four or five story, 105K - 128k sf facility that will be located within CMU's new Formation District. The five-story option would provide ground floor tenant finish retail, while the four-floor option proposes a utility basement. The Fixed Limit of Construction costs has been set at $42,500,000. Design is projected to begin in early October 2024 with construction of foundations to follow in January 2025. The preferred delivery date for Centennial Village is prior to the start of the fall semester, August 2025. An alternative, though much less desirable finish date for the project, would be prior to the start of the spring semester in January 2026. The final schedule will be developed with the AE team, CM/GC and Colorado Mesa University. Question Deadline 09/19/2024 at 11:00 AM MT Questions are submitted online No, Respondent initiated requests for clarification will be received on online. Anticipated Construction Start/Finish 11/1/24 - 1/1/26 The State reserves the right to reject any or all proposals on the basis of being unresponsive to this RFP or for failure to disclose requested information. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. *This project has been awarded and all trades have been let.

Under Construction

Educational

$42,500,000.00

Public - State/Provincial

New Construction, Site Work

3

9

2

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
10
Active Projects
0
Bidding Soon
185
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2024

January 15, 2025

Project location map

1100 North Ave, Grand Junction, CO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.