Site work and paving for a mixed-use development in Berkeley, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; transportation facility; and water / sewer project.

The City of Berkeley is advertising the Southwest Berkeley Bikeway and Bus Stop Improvements project The Engineer's estimate for the work is $2,400,000. The work of the Southside Complete Streets project consists of the following components: The work of this contract includes the following two work packages, to be performed by the selected contractor as a single project: Package A - Parker Street to Addison Street Bikeway (Specification No. 24-11640-C) is located along Mabel Street (from Ward Street to Dwight Way), Bonar Street (Dwight Way to Addison Street), Parker Street (9th Street to Mabel Street), and Acton Street (Carleton Street to Parker Street). Package B - University West Bus Stop Improvements (Specification No. 24-11666-C) is located on University Avenue at and near the Bonar Street and Acton Street intersections. Pre-Award Conference: The apparent low bidder will be invited to a pre-award conference tentatively scheduled for 11:00 A.M., Tuesday, October 29, 2024 at 1947 Center Street, 4th Floor, Berkeley, CA. The work of each package is briefly summarized as follows: Package A - Parker Street to Addison Street Bikeway (Specification No. 24-11640-C) will install bike boulevard infrastructure consisting of striping, pavement markings and wayfinding signage along the corridor. The proposed corridors include Mabel Street and Bonar Street between Parker Street and Addison Street, as well as Parker Street between Mabel Street and 9th Street. The work consists of, but is not limited to, coordination with utility companies, nearby residents, businesses, and organizations; clearing and grubbing existing vegetation; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete, concrete pavers, curb, gutter, and sidewalk; construction of new Portland Cement concrete sidewalks, curb ramps, and median; installation of asphalt concrete pavement and speed tables; adjusting utility boxes and covers to grade; relocation of storm drain infrastructure; installation of pavement striping and markings; installation of curb paint; installation of signage; and landscaping. Package B - University West Bus Stop Improvements (Specification No. 24-11666-C) will construct new sidewalk and curb bulbouts, replace sections of curb, gutter and sidewalk, and install four electrified bus shelters along University Avenue between Bonar Street and Acton Street. The work consists of, but is not limited to, coordination with utility companies, nearby residents, businesses, and organizations; clearing and grubbing existing vegetation; saw-cutting; removal of existing pavement markings and raised pavement markers; removal of existing asphalt concrete, concrete pavers, curb, gutter, and sidewalk; construction of new Portland Cement concrete sidewalks, curb ramps, and bus stop pads; installation of new bus stop shelters and benches, including both solar-powered and hard-wired shelters; installation of asphalt concrete pavement; adjusting utility boxes and covers to grade; relocation of storm drain infrastructure; installation of pavement striping and markings; installation of curb paint; installation of signage; and installation of new traffic signal poles and associated traffic signal electrical equipment and systems. The work includes preparation and submittal of a Construction Phasing Plan, as well as Traffic Control Plans for each phase of work. Work occurs in the City right of way. The Contractor is responsible to obtain all necessary permits, approvals, etc. to perform the Work. California Contractor License Classification required: A General Engineering Planholders List: Bidders are responsible for notifying Kenneth Jung, Project Manager, via email at kjung@berkeleyca.gov to be included on the Planholders List. Please include the following in the email subject header: "Spec. Nos. 24-11640-C & 24-11666-C - Request to be included in project Planholders List." In the body of the email, please state the Name of the Company Representative, Company Name, Address, Telephone Number, Fax Number, and Email Address. Questions: Technical questions should be directed to Kenneth Jung, Project Manager, at kjung@berkeleyca.gov no later than 10:00 am, Wednesday, October 16, 2024. Contact: Kenneth Jung, KJung@Berkeleyca.gov

Bid Results

Sidewalks / Parking Lot

$2,165,361.00

Public - City

Paving, Site Work

57

23

2

6

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
95
Bidding Soon
1,844
All Active Projects
686
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 22, 2024

December 23, 2024

img_map_placeholder

Multiple Locations, Berkeley, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.