EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 29, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Bonners Ferry, Idaho. Completed plans call for site work for a water / sewer project.

The project is located at the Boundary-Smith Creek WMA, approximately 28 miles northwest of Bonners Ferry, Boundary County, Idaho. It consists of removing and disposing of three (3) round, corrugated-metal water control structures and replacing them with rectangular, precast concrete structures. Deep excavations and shoring are anticipated, and ground water is likely to be encountered. Proposals must be accompanied by cash (no personal or business checks), a certified check, or cashiers check drawn on a bank in good standing A bid bond in the amount of 5% of the bid is required The successful Bidder shall file with the Owner a Performance Bond and a Labor and Materials Payment Bond on the forms bound herewith, or suitable substitutes, each in the full amount of the Contract price, The Bidder further agrees to begin work within 10 calendar days after the date shown on the Notice to Proceed and to complete the construction, in all respects, for which his Proposal is accepted within the number of calendar days after the date of execution of the Contract by the Owner as set forth below: 90 Calendar Days

Award

Water / Sewer

$336,870.00

Public - State/Provincial

Site Work

6

12

9

5

Subscribe For Documents

29 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Execution
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Dewatering, Backfill, Compaction
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
12
Bidding Soon
152
All Active Projects
83
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

January 2, 2025

img_map_placeholder

To Be Determined, Bonners Ferry, ID


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Boundary-Smith Creek WMA Water Control Structure(WCS) Replacement(#8, 12, & 13)

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.