BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a detention facility in Mitchellville, Iowa. Conceptual plans call for the renovation of a detention facility.

State Issuing Officer: Katelyn Howells Issuing Officer Iowa Department of Administrative Services Hoover State Office Building, Level 3 1305 East Walnut, Des Moines, IA 50319-0105 Phone: 515-721-7856 Email: construction.procurement@iowa.gov Questions, requests for clarification, and suggested changes from Respondents due to Construction Procurement 9-27-2024 at 2:00 pm Number of Copies of Proposals Required to be Submitted: 1 Digital Firm Proposal Terms The minimum number of days following the deadline for submitting Proposals that the firm guarantees all proposal terms, including price, will remain firm is 120 Days. PROJECT DESCRIPTION Construction Manager (The Samuels Group) has been engaged for this Project to serve as advisor to DAS and to provide assistance in administrating the Contract for Design between DAS and the Designer according to separate contract between DAS and Construction Manager. DAS is currently seeking design services from qualified firms for a project consisting of two, approximately 6,000 square feet roofs on Building 9 at ICIW in Mitchellville, Iowa. It will consist of the removal and replacement of an existing EPDM roof. Design services shall include: 1.3.1 The contract for this work will be a modified ConsensusDoc 803. See link on cover page for a sample contract. 1.3.2 All design disciplines necessary to complete the scope of work. 1.3.3 Attend design kick-off meeting onsite to discuss desired outcome of the project with the Owner, Construction Manager, and Owner's maintenance staff. 1.3.4 Use of the State of Iowa's construction management software program for uploading all documents, submitting and approving pay apps, and construction administration. The cost for the use of the software is paid by the Owner. 1.3.5 Review existing site for evaluation of current roof conditions and needs. 1.3.6 Existing PDF drawings will be provided to the successful design firm. Accuracy of drawings shall be verified by the design firm. {Include only if OR confirms that there are drawings available} 1.3.7 Design for scope of work. Provide material recommendations based on experience, quality, and price. Recommendations for replacements and upgrades shall include non- proprietary equipment and systems. 1.3.7.1 The roof has 2 sides; North and South. 1.3.7.2 Each side of the roof is approximately 6,000 square feet. 1.3.8 Provide minor drawing work to assist the Construction Manager in the development of hazardous materials bid package. This shall include providing PDF backgrounds for identification, by others, of hazardous materials removal. {Include only if hazmats are expected to be present} 1.3.9 Designer shall include any and all survey work required for completion of project. 1.3.10 Coordinate with State agencies to confirm utilities that may be abandoned as well as shut down requirements where required. 1.3.11 Provide detailed input of design schedule to Construction Manager for overall incorporation into master schedule. 1.3.12 Designer shall assist Construction Manager in the evaluation of long lead times. 1.3.13 Quality control during Design, Preconstruction and Construction. 1.3.14 Compliance with all Federal, State, and applicable Local codes. 1.3.15 Completion of State building and energy code documents, as required. 1.3.16 Design review will be conducted at 100% design development documents, 50% construction documents, and 95% construction documents. Review will be conducted with DAS Owner Representative, Construction Manager, and Facility Representative, at a minimum. Drawings, specifications and cost opinions (if applicable) shall be provided at least five days prior to each review meeting. An additional review meeting may be required at the end if there are discrepancies in cost opinions or constructability review questions. 1.3.17 Review with the State Fire Marshal's office for approval of plans or exemption from review. All fees associated with the State Fire Marshal's office are the responsibility of the designer. 1.3.18 Develop and distribute agendas and meeting minutes for all meetings during the design phase. 1.3.19 Designer shall provide any information necessary to obtain utility rebates where applicable. 1.3.20 Construction cost opinions provided by the Design Professional team during Design (at 100% design development documents, 95% construction documents, and with a Final Estimate for construction included with bid documents, per Iowa Code. 1.3.21 Construction drawings, specifications (the Construction Manager will produce Divisions 00 and 01), and addenda. 1.3.22 Provide bid alternates as determined during the course of design and bid package development. 1.3.23 Assist Owner and Construction Manager in obtaining bids from qualified contractors. 1.3.24 Construction administration, including creation of the submittal and closeout items log, review of and responses to submittals and closeout documentation, RFIs, proposal requests, change orders, pay applications, periodic site visits, attendance at project meetings as required, participation / development of contractor punch list, closeout documentation review and approval, certificates of substantial completion, and certificates of final completion, as well as development of Architectural Supplemental Instructions for design revisions, and punch lists within the construction management software program. 1.3.25 Participation with project team during construction progress meetings as required. Designer shall participate in bi-weekly conference calls during the construction period. 1.3.26 Field Observation reports, with photos, submitted for each site inspection within five (5) days of the site visit. 1.3.27 Acknowledgement that all documents are copyright to the State of Iowa and shall be turned over to the State of Iowa in their native computer format. Any ASIs/RFIs/PRs and addendums will be expected to be incorporated before final posting. Both the native computer format and PDF versions shall be uploaded to the construction management software program at the end of the project. 1.3.28 The Department requests lump sum pricing from the respondents to this RFP, with the lump sum base scope price being inclusive of all reimbursables, such as printing, mileage and travel expenses. The Department requests the fee proposal from the respondents to this RFP be broken down as follows. These breakdown prices will be used as the schedule of values for billing purposes. 1.3.28.1 1.3.28.2 1.3.28.3 1.3.28.4 Design Development Documents Construction Documents Bidding or Negotiation Assistance Construction Phase Include at a minimum, nine (9) site visits. Design kick off/Building evaluation, 100% design development document review meeting, 50% document review, Pre-bid meeting, Construction Field Observation (2), Substantial completion/punch list development, Punch list/Final Completion approval, and one year warranty correction period visit. Design Review at 95% construction document development will be conducted via conference call. Beyond these site visits, each proposing firm shall provide additional visits as they see fit to complete the work of design. In addition to the lump sum pricing, the Department requests a unit price per construction inspection visit. This unit price will be additive or deductive based on the number of actual visits made. SCHEDULE DAS is seeking a firm that can commence work upon execution of a contract. Time is of the essence. Execution of Designer's Contract Week of October 7, 2024 Tentative Design Kick-Off Meeting Week of November 4, 2024 100% Design Development Documents and Cost Opinion By Design Professional to propose in RFP Schedule 50% Construction Documents Design Professional to propose in RFP Schedule 95% Construction Documents and Cost Opinion By Design Professional to propose in RFP Schedule 100% Construction Documents and Cost Opinion By Design Professional to propose in RFP Schedule Contractor Bidding February 2025 Execution of Contractor's Contract(s) February 28th, 2025 Submittals, Procurement and Construction March 3rd, 2025 to July 31, 2025 Close out August 2025 Contact Name: Construction Procurement Contact Title: Michael Bradbury Contact Email: construction.procurement@iowa.gov Contact Phone Number: (515) 823-9327

Conceptual

Jails / Prisons

$780,000.00

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
44
Bidding Soon
464
All Active Projects
251
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 6, 2025

img_map_placeholder

420 Mill St SW, Mitchellville, IA

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.