BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a library in Minneapolis, Minnesota. Completed plans call for the renovation of a library.

Clarification Deadline 10/10/2024 4:00 PM Contact Information Questions related to ProcureWare should be addressed to: Michael Rosenfeld (Hennepin County) E-mail: michael.Rosenfeld@hennepin.us Mary Knickerbocker (Hennepin County), E-mail: mary.knickerbocker@hennepin.us All other questions concerning the bid must be submitted through the clarifications tab in ProcureWare. PROJECT DESCRIPTION / OWNER INTENT The intent of this project is to replace the existing, indoor air handling unit, roof mounted condensing unit, and associated electric duct heaters with an air-cooled, low ambient variable refrigerant flow system (VRF) for both heating and cooling. The existing air handling unit and condensing unit will be demolished. All the electric duct heaters will be demolished or disconnected and abandoned in place. The low ambient (-18F) VRF system will be capable of simultaneously heating or cooling. The outdoor units will be located on ground level on the plan west side of the building. The associated refrigerant pipe will be routing into the building then split to the appropriate branch controllers located in the building. Special attention should be paid to the refrigerant routing, as some piping is required to ran across the roof to prevent disturbing the interior facade. Ducted and ductless fan coils will be installed to provided heating and cooling to the spaces. The condensate from these units will be pumped to the nearest acceptable termination point (roof, floor drain, or tail piece). For ventilation, a roof- mounted dedicated outdoors air system (DOAS) with heat wheel energy recovery and back-up electric heat will be installed. The unit return shall be ducted to the building return air plenum. The supply air with be connected to the existing supply air system and connect to each new VRV fan coil. Existing ductwork shall only be modified in areas where lay-in ceiling exists. All hard-lid ceiling is to remain. The new HVAC equipment shall be integrated into the JCI building controls system. The individual units shall be controlled by the manufacturer's control system and each unit will be monitored by the JCI system. The existing electrical service panels will be removed and replaced. All other electrical work is concurrent with the mechanical scope to provide power to the afore mentioned equipment and systems.

Post-Bid

Library

$630,000.00

Public - County

Renovation

21

12

22

4

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
785
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 23, 2024

November 22, 2024

img_map_placeholder

830 Winnetka Ave N, Minneapolis, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.