Site work and renovation of a mixed-use development in Whitehorse, Yukon Territory. Completed plans call for the renovation of a power facility; and for site work for a power facility.

The Mayo A Hydro site (MH0) was initially commissioned in 1952 and expanded in 1956 to the current configuration of 2 x 2.5MW Francis turbine-generators. In 2012 the Mayo B Hydro station was added to the facility. This new site has two Francis turbines. Mayo A Hydro and Mayo B Hydro are fed from a joint intake in Wareham Lake. The rock slope above the MH0 plant experienced significant rockslides in 2022 and 2023 and has been found to be at risk of future failure. The slope needs to be stabilized to ensure continued safe operation of the plant into the future. There is a surge tank located on the rock slope that provides hydraulic protection to the Mayo Generating Station (MGS). The surge tank is over 70 years old, has been deemed end of life and needs to be replaced. There are two main Scopes of Work. 1. Stabilizing the slope to prevent future rockslides and slope failure. 2. Replacing the MH0 surge tank along with associated electrical work. Yukon Energy is combining the slope stabilization and surge tank replacement projects due to the small footprint and steep slope of the site, which make it practical to address both issues simultaneously. The requirement to complete the surge tank replacement in 2025 and the slope stabilization by 2026 necessitates a coordinated approach to prevent delays. Crucially, stabilizing the slope above the surge tank is necessary to ensure safety and structural integrity before constructing the new tank. By executing both scopes of work concurrently, Yukon Energy can achieve schedule efficiencies, streamlining the overall project timeline. A construction sequence to align these two scopes has been developed to minimize risk and meet the Corporation’s needs for generation and water flow. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Acceptance Deadline 2024/11/02 02:59:00 AM EDT Bid Intent Deadline 2024/11/19 02:59:00 AM EST

GC Bidding

Power Plant

$100,000.00

Public - State/Provincial

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

10

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
24
All Active Projects
9
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

January 24, 2025

img_map_placeholder

Multiple Locations, Whitehorse, YT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.