BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a transportation facility in Costa Mesa, California. Completed plans call for the renovation of a transportation facility.

contractors for Terminal A and C Fiber Cabling Installation for John Wayne Airport (JWA). By certified or cashier's check from a responsible bank, cash or an original bidder's bond issued and executed by an admitted surety insurer authorized to transact surety insurance in California, made payable to the order of the county of Orange in an amount equal to at least ten percent (10%) of the total bid amount, as a guarantee that the bidder will enter into the proposed contract if it is awarded to that bidder. In the event the bidder to which the contract is awarded fails to provide bonds and insurance and meet other preconditions to the County's execution of the contract in a timely manner, the proceeds of the check or cash or the full sum of the bidder's bond will be forfeited to the County. Original bid security documents shall be received at the following address . on the bid closing date or submittals shall be deemed non-responsive: County of Orange Information Technology Attn: Tami Tran 721 S. Parker St., 2nd Floor Orange, CA 92868. Question Deadline 10/03/2024 at 2:00 PM PT Only questions answered via the online. 2. SCOPE OF WORK Contractor shall perform all work as required by, and in strict accordance with, the Contract Documents (the "Project"), which consists of the following: A. Install Single Mode Fiber cable from the Lighting Vault to the North Telcom RM. 1. The SM fiber will terminate to SM-LC splice Corning cassettes and be housed in new Corning enclosures. The SM fiber will go to existing cabinets in the Lighting Vault and Terminal A Server room. 2. Work to include Corning rack mount enclosure, Corning splice cassettes, Misc. Mat tape, Velcro, labels, tie wraps, fiber tags, and rope. B. Install Single Mode Fiber cable from the North Telcom Rm to the Terminal A Server Room and Terminal C MDF (1073). 1. The SM fiber will terminate to SM-LC splice Corning cassettes and housed in new Corning enclosures. 2. Work to include Corning rack mount enclosure, Corning splice cassettes, Misc. Ma tape, Velcro, labels, tie wraps, fiber tags, and rope. a. Using existing airfield pathways, install fiber cables along with a nylon rope, or pull string. b. Please use proper PPE when installing in the manholes or man vaults, Outside Plant cabling installation shall be the preferred type of fiber optic cabling. c. Please document all existing pathways and submit them to JWA for documentation purposes. d. Label Fiber in all accessible areas including manholes and vaults. Including the head end locations or termination points. e. Terminate and test fiber cables with Power Meter and turn in test results to JWA. Failed test results will not be accepted. f. JWA will inspect the pathway and installation of the fiber cables before the project can be closed out. g. Fiber Optic products shall be manufactured by Corning unless specified by the owner h. All Installation shall be done in conformance with ANSI/TIA/EIA 568B and BICSI installation guidelines. The contractor shall ensure that the max pulling tension of the specified fiber optic cable are not exceeded and the cable bends maintain the proper radius require the Contractor to provide, in a timely fashion, the additional material and labor necessary to properly rectify the situation. This shall also apply to any and all damages sustained to the cables by the contractor during the implementation.

GC Bidding

Transportation Terminals

$300,000.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
556
Active Projects
260
Bidding Soon
4,111
All Active Projects
1,873
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 10, 2024

November 11, 2024

img_map_placeholder

3160 Airway Ave, Costa Mesa, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.