BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Elkton, Virginia. Completed plans call for site work for a water / sewer project.

Question Deadline 10/04/2024 All questions concerning this project shall be in writing directed to WW Associates, Inc., E-Mail: hwhite@wwassociates.net. Herbert F. White, III, P.E. is the point of contact. To be given consideration, requests for interpretations must be received in time to allow preparation of written response at least 5 days prior for receipt of bids. The project will consist of construction of the following work: Replacement of approximately 4,250 linear feet of 8-inch inch diameter water line with 12-inch diameter water line. Removal and replacement of existing water service laterals connecting existing water meters with new water service laterals All questions concerning this project shall be in writing directed to WW Associates, Inc., E-Mail: hwhite@wwassociates.net. Herbert F. White, III, P.E. is the point of contact. Bid Security: Bids shall be accompanied by a certified check or an acceptable bid bond in the amount of 5 percent of the base bid. A Performance Bond and a Payment Bond will be required in the amount of 100 percent of the bid. MBE/WBE firms are encouraged to submit bids. Bidders must comply with the following: the President's Executive Order # 11246 prohibiting discrimination in employment regarding race, color, creed, sex, or national origin; the President's Executive Orders # 12138 and 11625 regarding utilization of MBE/WBE firms; the Civil Rights Act of 1964; the Davis-Bacon Act; and Section 70901 of P. L. 117-58 of the Bipartisan Infrastructure Law, 2021, Infrastructure Investment and Jobs Act, Build America/Buy America Act. Bidders must certify that they do not or will not maintain or provide for their employees any facilities that are segregated on the basis of race, color, creed, or national origin. We further agree that if awarded the contract, we will commence the work on the date stated in the "Notice to Contractor to Proceed," and will prosecute the work and shall be substantially complete as defined in the general conditions within 300 calendar days and complete all obligations within 330 calendar days. The Owner and Contractor recognize that time is of the essence with this agreement and that the Owner will suffer financial loss if the work is not completed within 300 calendar days for all work associated with this project. They also recognize the delays, expense, and difficulties involved in proving the actual loss suffered by the Owner if the work is not completed on time. Accordingly, instead of requiring any such proof, the Owner and Contractor therefore agree that, as liquidated damages for delay (but not as a penalty), the Contractor shall pay the Owner one thousand dollars ($1,000.00) for each day that expires after the time specified for substantial completion of this project. The Owner reserves the right to reject any and all bids and waive any and all informalities and the right to disregard all nonconforming or conditional bids or counterproposals

Post-Bid

Water / Sewer

$700,000.00

Public - City

Site Work

16

6

2

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
59
Bidding Soon
1,081
All Active Projects
430
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.