BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Burnaby, British Columbia. Completed plans call for the construction of a 44,280-square-foot, two-story above grade educational facility; and 42,876-square-foot, three-story above grade educational facility.

The CSF is issuing this Request for Prequalification ("RFQ") to create a List of Qualified General Contractors (Shortlist") for two (2) new-build school projects in Pemberton, BC, and Burnaby, BC. This prequalification process aims to identify firms capable of undertaking these construction projects. Each school project will be tendered separately through individual tender calls. The Projects are: 1. A new K-12 school in Pemberton, BC located at 7371 Highway 99 (Ecole la Vallee (Pemberton) 2. A new elementary school in Burnaby, BC located at 7231 Frances Street (Ecole elementaire (Burnaby) Ecole Pemberton: Ecole La Vallee will offer education in French for students from kindergarten to Grade 12 with its own dedicated school. The CSF currently operates an elementary school in Pemberton, Ecole La Vallee, from a leased space at Signal Hill Elementary School, located at 1410 Portage Rd. In 2023, the CSF received approval for the development of a new school in Pemberton, designed to accommodate students from kindergarten to 12th grade. The school will create 220 new student seats, with the flexibility to add as many 150 new seats in the future. This project has been eagerly anticipated for many years by the Pemberton francophone community, and brings significant benefits to the community, including a daycare, and spaces that are shared with the community after hours such as the gymnasium, the multipurpose room, the playfield and others. The new development is located at 7371 99 HWY Pemberton, BC. The building consists of a two-storey school with the main floor entry at grade. The total floor area of the new school will be 4100 sq.m. The gymnasium and the multipurpose room would comprise a single-story double-height portion of the building while educational spaces, administration, and childcare space would be organized within a 2-storey massing. The project will also include a French-language child care while providing a convenient drop-off location for parents who also have school-aged children. The school building also includes a number of spaces shared with the community which will help bring francophone families together for recreational classes and events. The hard construction budget is expected to be around $45,000,000, including offsite and daycare construction costs, but excluding Owner supplied equipment and risk reserves. Ecole Burnaby: The CSF is planning the construction of a new elementary school on the land of the former Duthie-Union Elementary school in Burnaby. Recognizing the need to offer a substantively equivalent educational experience for students, the CSF identified the necessity for a new elementary school in Burnaby, a project already approved by the Ministry of Education and Child Care (ECC). The aim is to create a learning environment that addresses the needs of the community and ensures that students have access to quality French-first language elementary education in Burnaby and surrounding communities. The school will create 360 new student seats, with the flexibility to add as many 125 new seats in the future. This project has been eagerly anticipated for many years by the Pemberton francophone community, and brings significant benefits to the community, including a daycare, and spaces that are shared with the community after hours such as the gymnasium, the multipurpose room, the playfield and others. The school project is currently in the design phase, with construction documents in preparation. The school site was previously improved with an old school building which was demolished in summer 2024, delivering a clear site for the project's construction. Some backfilling and leveling/grading will be required by the Successful General Contractor for the area where the building was demolished. The school building generally consists of a three-storey steel structure with the main floor entry at grade. The gymnasium and the multipurpose room would comprise a single-story double-height portion of the building while childcare space would be organized within a 2-storey massing. The total floor area of the new school will be 3970 sq.m. The hard construction budget is expected to be around $30,000,000, including offsite and daycare construction costs, but excluding Owner supplied equipment and risk reserves.

GC Bidding

Educational

$75,000,000.00

Public - State/Provincial

New Construction, Site Work

35

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
153
Active Projects
61
Bidding Soon
2,100
All Active Projects
765
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

October 11, 2024

March 1, 2025

img_map_placeholder

Multiple Locations, Burnaby, BC


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.